Differences between revisions 12 and 13
Revision 12 as of 2020-08-07 13:33:53
Size: 3222
Editor: KousekiMiyo
Comment:
Revision 13 as of 2020-08-07 13:34:32
Size: 3229
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 19: Line 19:
  * Installation was finished.
  *
Now I try to diagonalize sensors and balance actuators by using the Prequa system.
  * I will do the modal damping on TypeA suspensions after the initialization work for sensors and actuators. (Next week)
  * (This week) Installation was finished. Now I try to diagonalize sensors and balance actuators by using the Prequa system.
  * (Next week) I will do the modal damping on TypeA suspensions after the initialization work for sensors and actuators.

Agenda/Minutes of the VIS Meeting on 2020/8/7

2020/8/7 14:00 -

Zoom Meeting

Participants:

Progress report

General

Type-A

  • [Miyo] Installed the Prequa system in TypeA

    • (This week) Installation was finished. Now I try to diagonalize sensors and balance actuators by using the Prequa system.
    • (Next week) I will do the modal damping on TypeA suspensions after the initialization work for sensors and actuators.

Type-B

  • On Monday I submitted the paper to CPC: JGW-P2011860.

  • Noise budget paper: I calculated upper limits to DAC and coil driver noise contribution to DARM for the BS: klog 14875.

Type-Bp

  • Noise budget paper: Fabian calculated upper limits to DAC and coil driver noise contribution to DARM for PRM: klog 14876.

Type-C

Controls

Electronics

Towards O4

  • KAGRA is in "Upgrade phase for O4". PreQua system was implemented to the Type-A.

  • Confirmation of personnel at the site.
    • Type-A team: Takahashi, Sato, Miyo, + Company(Jan-Apr)
    • Type-B/Bp team: (Shoda,) Hirata, Fabian, Washimi, + Company(Oct-Dec)
  • Procedure documents are required by SEO.
  • Schedule towards O4 (Chart) was revised.

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List).

Safety

Discussion

Travel Plans

Next meeting

  • On 2020/8/19(Wed)?

KAGRA/Subgroups/VIS/VISMinutes20200807 (last edited 2020-08-07 14:58:03 by RyutaroTakahashi)