1215
Comment:
|
1703
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
2020/8/7 14:00 - | 2020/8/7 14:00 - |
Line 6: | Line 6: |
Participants: | Participants: |
Line 12: | Line 12: |
* On Monday I submitted the paper to CPC: [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11860|JGW-P2011860]]. * Noise budget paper: I calculated upper limits to DAC and coil driver noise contribution to DARM for the BS: klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14875|14875]]. |
|
Line 13: | Line 16: |
* Noise budget paper: Fabian calculated upper limits to DAC and coil driver noise contribution to DARM for PRM: klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14876|14876]]. |
|
Line 16: | Line 21: |
Agenda/Minutes of the VIS Meeting on 2020/8/7
2020/8/7 14:00 -
Participants:
Progress report
General
Type-A
Type-B
On Monday I submitted the paper to CPC: JGW-P2011860.
Noise budget paper: I calculated upper limits to DAC and coil driver noise contribution to DARM for the BS: klog 14875.
Type-Bp
Noise budget paper: Fabian calculated upper limits to DAC and coil driver noise contribution to DARM for PRM: klog 14876.
Type-C
Controls
Electronics
Towards O4
KAGRA is in "Upgrade phase for O4". PreQua system was implemented to the Type-A.
- Confirmation of personnel.
- Type-A team: Takahashi, Sato, Miyo, + Company(EYV)
- Type-B/Bp team: Shoda(S), Hirata, Fabian, Washimi, + Company(Type-B/Bp)
cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List), Schedule towards O4 (Chart).
Safety
Discussion
Travel Plans
Next meeting
- On 2020/8/28(Fri)