Size: 2053
Comment:
|
Size: 2054
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 38: | Line 38: |
* On 2020/8/28(Fri) | * On 2020/8/19(Wed)? |
Agenda/Minutes of the VIS Meeting on 2020/8/7
2020/8/7 14:00 -
Participants:
Progress report
General
Type-A
Type-B
On Monday I submitted the paper to CPC: JGW-P2011860.
Noise budget paper: I calculated upper limits to DAC and coil driver noise contribution to DARM for the BS: klog 14875.
Type-Bp
Noise budget paper: Fabian calculated upper limits to DAC and coil driver noise contribution to DARM for PRM: klog 14876.
Type-C
Controls
Electronics
Towards O4
KAGRA is in "Upgrade phase for O4". PreQua system was implemented to the Type-A.
- Confirmation of personnel at the site.
- Type-A team: Takahashi, Sato, Miyo, + Company(Jan-Apr)
- Type-B/Bp team: (Shoda,) Hirata, Fabian, Washimi, + Company(Oct-Dec)
- Procedure documents are required by SEO.
- Wire gluing in PR3 (by Shoda)
- Filter height adjustment in Type-B (by Fabian)
cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List), Schedule towards O4 (Chart).
Safety
Discussion
Travel Plans
Next meeting
- On 2020/8/19(Wed)?