Line 12: Line 12:
Line 14: Line 13:
Line 16: Line 14:
Line 19: Line 16:
   * For (2.5m, F-Dsub<>F-Dsub) cable. We have Type2-2m(Dsub F-F, kapton) and Type4-1m(Dsub F-M, kapton). Two cables can be connected and extended.     * For (2.5m, F-Dsub<>F-Dsub) cable. We have Type2-2m(Dsub F-F, kapton) and Type4-1m(Dsub F-M, kapton). Two cables can be connected and extended.
 * Type-B paper: I received corrections, including the referees'. Thank you for your observations. I'm working on them.
 * I worked in Type-B remedying work procedures and time allocation: see below.
Line 28: Line 26:
Line 37: Line 34:
   * There's an updated version but it hasn't been uploaded to JGWDoc. Use this [[https://1drv.ms/b/s!AoQaV1tdsEcUgdBD4tVVUon9mmf7Zw?e=f6ORQ4|link]] instead.
   * See the last two slides of this [[https://1drv.ms/b/s!AoQaV1tdsEcUgdA2NHJtRoAN3fQrRQ?e=THDZi4|presentation]].
Line 45: Line 44:
  *[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11889|Presentation slides]]   * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11889|Presentation slides]]
Line 47: Line 46:

Agenda/Minutes of the VIS Meeting on 2020/8/28

2020/8/28 14:00 -

Zoom Meeting

Participants:

Progress report

General

Type-A

Type-B

  • Cable preparation for yaw stepper motor [Sato]
    • The five cables requested will be ordered in early October. However, would you consider the following alternatives.
      • For four (50 cm , kapton, M-Dsub<>bundy plug) cables. We have six unused cables of different lengths with similar specifications.(JGW-D1503901/24)

      • For (2.5m, F-Dsub<>F-Dsub) cable. We have Type2-2m(Dsub F-F, kapton) and Type4-1m(Dsub F-M, kapton). Two cables can be connected and extended.

  • Type-B paper: I received corrections, including the referees'. Thank you for your observations. I'm working on them.
  • I worked in Type-B remedying work procedures and time allocation: see below.

Type-Bp

Type-C

  • A concrete design proposal for IMMT2 modificaion has been uploaded. (JGW-D2011918)

Controls

Electronics

Towards O4

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List)

Safety

Discussion

  • [Terrence] New features for the suspensions, type-A and type-B, as pre-O4 upgrades (II).
  • [Ishizaki] GAS filter improvement for post O4.slide.pdf

Travel Plans

Next meeting

  • On 2020/9/4(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200828 (last edited 2020-08-28 16:24:02 by RyutaroTakahashi)