2020/8/28 14:00 - 2020/8/28 14:00 - 16:00
Line 6: Line 6:
Participants: Participants: Takahashi, Hirata, Miyo, Fabian, Ishizaki, Sato, Shoda, Tanaka, Terrence
Line 10: Line 10:
 * Preparing Github for the management of the tasks.
Line 12: Line 14:
 * Cable preparation for yaw stepper motor [Sato]
  * The five cables requested will be ordered in early October. However, would you consider the following alternatives.
   * For four (50 cm , kapton, M-Dsub<>bundy plug) cables. We have six unused cables of different lengths with similar specifications.([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3901|JGW-D1503901/24]])

   * For (2.5m, F-Dsub<>F-Dsub) cable. We have Type2-2m(Dsub F-F, kapton) and Type4-1m(Dsub F-M, kapton). Two cables can be connected and extended.
 * Type-B paper: I received corrections, including the referees'. Thank you for your observations. I'm working on them.
 * I worked in Type-B remedying work procedures and time allocation: see below.
Line 14: Line 24:
 * A concrete design proposal for IMMT2 modificaion has been uploaded. (JGW-D2011918)
Line 15: Line 27:
 * New RT model base was created by Nakano-kun. We shared the concept with core members (Nakano, Miyo, Terrence, Fabian, Ushiba, Shoda).
   Terrence will upgrade for the Type-B and -Bp. If the upgrade is necessary for RSE, Miyo and Shoda will do.
Line 16: Line 31:
 * Designing the circuits. Device size can fit to them.
Line 21: Line 37:
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11598|Limit switches]]   * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11598|Limit switches]], <-- revised
Line 25: Line 41:
 * Wiki page for Acceptance Test [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/Acceptance%20Test]].    * There's an updated version but it hasn't been uploaded to JGWDoc. Use this [[https://1drv.ms/b/s!AoQaV1tdsEcUgdBD4tVVUon9mmf7Zw?e=f6ORQ4|link]] instead.
   * See the last two slides of this [[https://1drv.ms/b/s!AoQaV1tdsEcUgdA2NHJtRoAN3fQrRQ?e=THDZi4|presentation]].
 * Acceptance Test ([[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/Acceptance%20Test|Wiki page]]).
Line 33: Line 51:
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11889|Presentation slides]]
Line 34: Line 53:

Agenda/Minutes of the VIS Meeting on 2020/8/28

2020/8/28 14:00 - 16:00

Zoom Meeting

Participants: Takahashi, Hirata, Miyo, Fabian, Ishizaki, Sato, Shoda, Tanaka, Terrence

Progress report

General

  • Preparing Github for the management of the tasks.

Type-A

Type-B

  • Cable preparation for yaw stepper motor [Sato]
    • The five cables requested will be ordered in early October. However, would you consider the following alternatives.
      • For four (50 cm , kapton, M-Dsub<>bundy plug) cables. We have six unused cables of different lengths with similar specifications.(JGW-D1503901/24)

      • For (2.5m, F-Dsub<>F-Dsub) cable. We have Type2-2m(Dsub F-F, kapton) and Type4-1m(Dsub F-M, kapton). Two cables can be connected and extended.

  • Type-B paper: I received corrections, including the referees'. Thank you for your observations. I'm working on them.
  • I worked in Type-B remedying work procedures and time allocation: see below.

Type-Bp

Type-C

  • A concrete design proposal for IMMT2 modificaion has been uploaded. (JGW-D2011918)

Controls

  • New RT model base was created by Nakano-kun. We shared the concept with core members (Nakano, Miyo, Terrence, Fabian, Ushiba, Shoda).
    • Terrence will upgrade for the Type-B and -Bp. If the upgrade is necessary for RSE, Miyo and Shoda will do.

Electronics

  • Designing the circuits. Device size can fit to them.

Towards O4

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List)

Safety

Discussion

  • [Terrence] New features for the suspensions, type-A and type-B, as pre-O4 upgrades (II).
  • [Ishizaki] GAS filter improvement for post O4.slide.pdf

Travel Plans

Next meeting

  • On 2020/9/4(Fri)