Line 10: Line 10:
 * VIS team plan to test the ribbon heater on the cross tube in IX or IY just before the vent of chambers.
Line 26: Line 27:
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11520|Limit switch connecting guide]] <--- New   * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11520|Limit switch connecting guide]]
Line 41: Line 42:
 * The week from 9/28
  * Takahashi: 9/30-10/2
The week from 9/28
 * Takahashi: 9/30-10/2

Agenda/Minutes of the VIS Meeting on 2020/9/18

2020/9/18 13:30 -

Zoom Meeting

Participants:

Interface between VIS and CRY

  • Interface meeting was set to discuss about the integrated CAD model, the link between Cryo-payload and Type-A tower, the schedule, and so on. Mainly in Japanese for the engineers.
  • VIS team plan to test the ribbon heater on the cross tube in IX or IY just before the vent of chambers.
  • Acceptance Test (Wiki page, Inspection document style).

Progress report

General

Type-A

Type B

Type-Bp

Type-C

Controls

Electronics

Towards O4

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List)

Safety

Discussion

Travel Plans

The week from 9/28

  • Takahashi: 9/30-10/2
    • Sato: 9/30-10/2
    • Hirata: 9/30-10/2
  • The week from 10/5
    • Takahashi: 10/5-9
    • Sato: 10/5-9
    • Hirata: 10/5-9