Line 20: Line 20:
  * In BS F1 I was able to move the keystone down to 230 um. Before the lowest the FR would allow was 488 um. I changed the setpoint accordingly and updated BURT and SDF files (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15027|15027]]).   * In BS F1 I was able to move the keystone down to 230 um. Before the lowest the FR would allow was 488 um. I changed the setpoint accordingly and together with Miyo-kun I updated BURT and SDF files (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15027|15027]]).

Agenda/Minutes of the VIS Meeting on 2020/9/18

2020/9/18 13:30 -

Zoom Meeting

Participants:

Interface between VIS and CRY

  • Interface meeting was set to discuss about the integrated CAD model, the link between Cryo-payload and Type-A tower, the schedule, and so on. Mainly in Japanese for the engineers.
  • Post O3 Upgrade portal

  • VIS team plan to test the ribbon heater on the cross tube in IX or IY just before the vent of chambers.
  • Acceptance Test (Wiki page, Inspection document style).

Progress report

General

Type-A

Type B

  • Preparation work with suspensions:
    • In BS, SR2 and SRM GAS filters I offloaded coil-maget actuation onto fishing rods (klog 15027, 15039, 15042).

    • In BS F1 I was able to move the keystone down to 230 um. Before the lowest the FR would allow was 488 um. I changed the setpoint accordingly and together with Miyo-kun I updated BURT and SDF files (klog 15027).

    • The temperature was relatively high at the moment (klog 15040). I told Moyoki-san and he installed coolers (klog 15043). The temperature has been dropping since then (klog 15052).

    • I'll offload again once the DC actuation in GAS filters stops drifting.
    • I'll measure IP resonant frequencies again.
    • I told Takahashi-san about the yokes in BS IP coil-magnet actuators. They require cleaning and nickel coating.
  • I went to the tunnel with Miyo-kun and cheked the holders for the gauge dials. We'll need to but longer rods. I'll let Takahashi-san know.
  • Highlight in documentation:
    • Shoda-san, Takahashi-san, Hirata-san and Miyo-kun gave me feedback about the document. Thank you very much! B)

    • An overall BS procedure is now readable.
    • Hirata-san checked the section about the Lower Breadboard (LBB) and provided a picture for SR3 section.
    • I added a secton on how to set the fishing rods to mid-range position.
      • During installation we measured the total range of the motor in number of steps.
      • For the FRs that are at the end of their ranges we just have to move them by half of the total range.
    • I added a section about monitoring the IPs during venting. I got feedback and updated the document.

Type-Bp

Type-C

Controls

Electronics

Towards O4

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List)

Safety

Discussion

Travel Plans

The week from 9/28

  • Takahashi: 9/30-10/2
  • Sato: 9/30-10/2
  • Hirata: 9/30-10/2

The week from 10/5

  • Takahashi: 10/5-9
  • Sato: 10/5-9
  • Hirata: 10/5-9

Next meeting

  • On 2020/9/25(Fri)