Differences between revisions 14 and 15
Revision 14 as of 2020-09-18 12:36:01
Size: 5165
Comment:
Revision 15 as of 2020-09-18 14:54:37
Size: 5354
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
2020/9/18 13:30 - 2020/9/18 13:30 - 14:40
Line 6: Line 6:
Participants: Participants: Takahashi, Sato, Aso, Hirata, Miyo, Tomaru, Akutsu, Ushiba, Fabian, Terrence, Shoda, Washimi
Line 39: Line 40:
 * Real-time model modification for Type-B/Bp is suspended due to the RSE Trial now.

Agenda/Minutes of the VIS Meeting on 2020/9/18

2020/9/18 13:30 - 14:40

Zoom Meeting

Participants: Takahashi, Sato, Aso, Hirata, Miyo, Tomaru, Akutsu, Ushiba, Fabian, Terrence, Shoda, Washimi

Interface between VIS and CRY

  • Interface meeting was set to discuss about the integrated CAD model, the link between Cryo-payload and Type-A tower, the schedule, and so on. Mainly in Japanese for the engineers.
  • Post O3 Upgrade portal

  • VIS team plan to test the ribbon heater on the cross tube in IX or IY just before the vent of chambers.
  • Acceptance Test (Wiki page, Inspection document style).

Progress report

General

Type-A

Type B

  • Mark finished checking the paper. I'll submit it within a few days.
  • Preparation work with suspensions:
    • In BS, SR2 and SRM GAS filters I offloaded coil-maget actuation onto fishing rods (klog 15027, 15039, 15042).

    • In BS F1 I was able to move the keystone down to 230 um. Before the lowest the FR would allow was 488 um. I changed the setpoint accordingly and together with Miyo-kun I updated BURT and SDF files (klog 15027).

    • The temperature was relatively high at the moment (above 24 degrees; klog 15040). I told Moyoki-san and he installed coolers (klog 15043). The temperature has been dropping since then (klog 15052). It's now 23.2 degrees arond BS.

    • I'll offload again once the DC actuation in GAS filters stops drifting.
    • I'll measure IP resonant frequencies again.
    • I told Takahashi-san about the yokes in BS IP coil-magnet actuators. They require cleaning and nickel coating.
  • I went to the tunnel with Miyo-kun and cheked the holders for the gauge dials. We'll need to but longer rods. I'll let Takahashi-san know.
  • Highlight in documentation:
    • Shoda-san, Takahashi-san, Hirata-san and Miyo-kun gave me feedback about the document. Thank you very much! B)

    • An overall BS procedure is now readable.
    • Hirata-san checked the section about the Lower Breadboard (LBB) and provided a picture for SR3 section.
    • I added a secton on how to set the fishing rods to mid-range position.
      • During installation we measured the total range of the motor in number of steps.
      • For the FRs that are at the end of their ranges we just have to move them by half of the total range.
    • I added a section about monitoring the IPs during venting. I got feedback and updated the document.

Type-Bp

Type-C

Controls

  • Real-time model modification for Type-B/Bp is suspended due to the RSE Trial now.

Electronics

Towards O4

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List)

Safety

Discussion

Travel Plans

The week from 9/28

  • Takahashi: 9/30-10/2
  • Sato: 9/30-10/2
  • Hirata: 9/30-10/2

The week from 10/5

  • Takahashi: 10/5-9
  • Sato: 10/5-9
  • Hirata: 10/5-9

Next meeting

  • On 2020/9/25(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200918 (last edited 2020-09-18 15:00:09 by RyutaroTakahashi)