Differences between revisions 2 and 3
Revision 2 as of 2020-09-17 10:03:14
Size: 2588
Comment:
Revision 3 as of 2020-09-17 10:09:46
Size: 2696
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
 * VIS team plan to test the ribbon heater on the cross tube in IX or IY just before the vent of chambers.

Agenda/Minutes of the VIS Meeting on 2020/9/18

2020/9/18 13:30 -

Zoom Meeting

Participants:

Interface between VIS and CRY

  • Interface meeting was set to discuss about the integrated CAD model, the link between Cryo-payload and Type-A tower, the schedule, and so on. Mainly in Japanese for the engineers.
  • VIS team plan to test the ribbon heater on the cross tube in IX or IY just before the vent of chambers.
  • Acceptance Test (Wiki page, Inspection document style).

Progress report

General

Type-A

Type B

Type-Bp

Type-C

Controls

Electronics

Towards O4

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List)

Safety

Discussion

Travel Plans

  • The week from 9/28
    • Takahashi: 9/30-10/2
    • Sato: 9/30-10/2
    • Hirata: 9/30-10/2
  • The week from 10/5
    • Takahashi: 10/5-9
    • Sato: 10/5-9
    • Hirata: 10/5-9

Next meeting

  • On 2020/9/25(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200918 (last edited 2020-09-18 15:00:09 by RyutaroTakahashi)