Line 6: Line 6:
Participants:  Participants:
Line 18: Line 18:
 * Preparation work with suspensions:
  * In GAS filters I offloaded coil-maget actuation onto fishing rods. Klog entries:
  * The temperature was relatively high at the moment (klog ). I told Moyoki-san and he installed coolers. The temperature has been dropping since then.
  * I'll offload again once the DC actuation in GAS filters stops drifting.
  * I'll measure IP resonant frequencies again.
 * I went to the tunnel with Miyo-kun and cheked the holders for the gauge dials. We'll need to but longer rods. I'll let Takahashi-san know.
 * Highlight in documentation:
  * Shoda-san, Takahashi-san, Hirata-san and Miyo-kun gave me feedback about the document. Thank you very much! B)
  * An overall BS procedure is now readable.
  * Hirata-san checked the section about the Lower Breadboard (LBB) and provided a picture for SR3 section.
  * I added a secton on how to set the fishing rods to mid-range position.
   * During installation we measured the total range of the motor in number of steps.
   * For the FRs that are at the end of their ranges we just have to move them by half of the total range.
  * I added a section about monitoring the IPs during venting. I got feedback and updated the document.
Line 22: Line 37:
Line 46: Line 60:
Line 51: Line 66:

Agenda/Minutes of the VIS Meeting on 2020/9/18

2020/9/18 13:30 -

Zoom Meeting

Participants:

Interface between VIS and CRY

  • Interface meeting was set to discuss about the integrated CAD model, the link between Cryo-payload and Type-A tower, the schedule, and so on. Mainly in Japanese for the engineers.
  • Post O3 Upgrade portal

  • VIS team plan to test the ribbon heater on the cross tube in IX or IY just before the vent of chambers.
  • Acceptance Test (Wiki page, Inspection document style).

Progress report

General

Type-A

Type B

  • Preparation work with suspensions:
    • In GAS filters I offloaded coil-maget actuation onto fishing rods. Klog entries:
    • The temperature was relatively high at the moment (klog ). I told Moyoki-san and he installed coolers. The temperature has been dropping since then.
    • I'll offload again once the DC actuation in GAS filters stops drifting.
    • I'll measure IP resonant frequencies again.
  • I went to the tunnel with Miyo-kun and cheked the holders for the gauge dials. We'll need to but longer rods. I'll let Takahashi-san know.
  • Highlight in documentation:
    • Shoda-san, Takahashi-san, Hirata-san and Miyo-kun gave me feedback about the document. Thank you very much! B)

    • An overall BS procedure is now readable.
    • Hirata-san checked the section about the Lower Breadboard (LBB) and provided a picture for SR3 section.
    • I added a secton on how to set the fishing rods to mid-range position.
      • During installation we measured the total range of the motor in number of steps.
      • For the FRs that are at the end of their ranges we just have to move them by half of the total range.
    • I added a section about monitoring the IPs during venting. I got feedback and updated the document.

Type-Bp

Type-C

Controls

Electronics

Towards O4

cf. Post Obs. task (Request), Task for O3c (Plan, Sheet), Task towards O4 (List)

Safety

Discussion

Travel Plans

The week from 9/28

  • Takahashi: 9/30-10/2
  • Sato: 9/30-10/2
  • Hirata: 9/30-10/2

The week from 10/5

  • Takahashi: 10/5-9
  • Sato: 10/5-9
  • Hirata: 10/5-9

Next meeting

  • On 2020/9/25(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200918 (last edited 2020-09-18 15:00:09 by RyutaroTakahashi)