Agenda/Minutes of the VIS Meeting on 2020/9/25
2020/9/25 13:00 -
Participants:
Interface VIS+CRY
- Schedule
Progress report
General
Type-A
- [Fujii] Can you please update the status of paper writing especially about the Type-A mechanics and its control? I also would like to know the rough schedule that you team are planning. Please let me know. Leaving your comments here will be enough. O-tsu-ka-re-sa-ma-de-su. (My account will have to be removed I guess btw..)
Type-B
[Sato] Design of the limit switches for BS IP FR. BS IP FR limit switch_20200924.pdf
Type-Bp
Type-C
Controls
Electronics
Towards O4
- KAGRA is in "RSE Trial" now. "SEO is thinking about possibility for one week extension and the schedule reconstruction for vacuum chamber opening."
- Preparation work.
- The preparation work will be started on Oct. 1st.
Inventory sheet with the segment name is necessary (Example of Type-A).
- Procedure documents.
Criteria in the acceptance test Sheet.
- Presentation
- PAB (10/8)
- Chief Meeting (10/12)
Safety
Discussion
Travel Plans
The week from 9/28
- Takahashi: 9/30-10/2
- Sato: 9/30-10/2
- Hirata: 9/30-10/2
The week from 10/5
- Takahashi: 10/5-9
- Sato: 10/5-9
- Hirata: 10/5-9
Next meeting
- On 2020/10/2(Fri)