Line 18: Line 18:
 * [Sato] Design of the limit switches for BS IP FR.  * [Sato] Design of the limit switches for BS IP FR. [[attachment:BS IP FR limit switch_20200924.pdf]]
Line 40: Line 40:
 * Criteria in the acceptance test [[https://www.dropbox.com/s/pc9y3im2v4yvz6n/Acceptance%20test%20criteria.xlsx?dl=0|Sheet]].

Agenda/Minutes of the VIS Meeting on 2020/9/25

2020/9/25 13:00 -

Zoom Meeting

Participants:

Interface VIS+CRY

Progress report

General

Type-A

  • [Fujii] Can you please update the status of paper writing especially about the Type-A mechanics and its control? I also would like to know the rough schedule that you team are planning. Please let me know. Leaving your comments here will be enough. O-tsu-ka-re-sa-ma-de-su. (My account will have to be removed I guess btw..)

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 9/28

  • Takahashi: 9/30-10/2
  • Sato: 9/30-10/2
  • Hirata: 9/30-10/2

The week from 10/5

  • Takahashi: 10/5-9
  • Sato: 10/5-9
  • Hirata: 10/5-9

Next meeting

  • On 2020/10/2(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200925 (last edited 2020-09-25 15:50:46 by RyutaroTakahashi)