2020/9/25 13:00 -  2020/9/25 13:00 -
Line 6: Line 6:
Participants:  Participants:
Line 19: Line 19:
 * I submitted the paper to C&QG, finally.
 * Hirata-san and I had an information session for Washimi-san.
 * I asked to Takahashi-san for some long poles to mount the dial gauges around outer frames. Maybe there are some in TAMA. Work in progress.
 * Given the new temperature conditions in the central room, I offloaded fishing rods:
  * SR2 (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15081|15081]]) and SRM (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15083|15083]]) fishing rods are working well.
  * BS: F0 and BF fishing rods look healthy and F1 one is at the bottom of its range (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15071|15071]]).
  * SR3: F0 fishig rod is healthy, the F1 one is still jammed and BF one at its upper limit (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15070|15070]]).
  * I changed some DC filters setpoint and updated BURT and SDF files. In SR3 I keep the height of the mirror constant.
 *
Line 24: Line 33:
Line 40: Line 48:
 * Criteria in the acceptance test [[https://www.dropbox.com/s/pc9y3im2v4yvz6n/Acceptance%20test%20criteria.xlsx?dl=0|Sheet]].
Line 43: Line 52:
 

Agenda/Minutes of the VIS Meeting on 2020/9/25

2020/9/25 13:00 -

Zoom Meeting

Participants:

Interface VIS+CRY

Progress report

General

Type-A

  • [Fujii] Can you please update the status of paper writing especially about the Type-A mechanics and its control? I also would like to know the rough schedule that you team are planning. Please let me know. Leaving your comments here will be enough. O-tsu-ka-re-sa-ma-de-su. (My account will have to be removed I guess btw..)

Type-B

  • [Sato] Design of the limit switches for BS IP FR. BS IP FR limit switch_20200924.pdf

  • I submitted the paper to C&QG, finally.

  • Hirata-san and I had an information session for Washimi-san.
  • I asked to Takahashi-san for some long poles to mount the dial gauges around outer frames. Maybe there are some in TAMA. Work in progress.
  • Given the new temperature conditions in the central room, I offloaded fishing rods:
    • SR2 (klog 15081) and SRM (klog 15083) fishing rods are working well.

    • BS: F0 and BF fishing rods look healthy and F1 one is at the bottom of its range (klog 15071).

    • SR3: F0 fishig rod is healthy, the F1 one is still jammed and BF one at its upper limit (klog 15070).

    • I changed some DC filters setpoint and updated BURT and SDF files. In SR3 I keep the height of the mirror constant.

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 9/28

  • Takahashi: 9/30-10/2
  • Sato: 9/30-10/2
  • Hirata: 9/30-10/2

The week from 10/5

  • Takahashi: 10/5-9
  • Sato: 10/5-9
  • Hirata: 10/5-9

Next meeting

  • On 2020/10/2(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200925 (last edited 2020-09-25 15:50:46 by RyutaroTakahashi)