2020/9/25 13:00 - | 2020/9/25 13:00 - |
Line 6: | Line 6: |
Participants: | Participants: |
Line 19: | Line 19: |
* I submitted the paper to C&QG, finally. * Hirata-san and I had an information session for Washimi-san. * I asked to Takahashi-san for some long poles to mount the dial gauges around outer frames. Maybe there are some in TAMA. Work in progress. * Given the new temperature conditions in the central room, I offloaded fishing rods: * SR2 (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15081|15081]]) and SRM (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15083|15083]]) fishing rods are working well. * BS: F0 and BF fishing rods look healthy and F1 one is at the bottom of its range (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15071|15071]]). * SR3: F0 fishig rod is healthy, the F1 one is still jammed and BF one at its upper limit (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15070|15070]]). * I changed some DC filters setpoint and updated BURT and SDF files. In SR3 I keep the height of the mirror constant. * |
|
Line 24: | Line 33: |
Line 40: | Line 48: |
* Criteria in the acceptance test [[https://www.dropbox.com/s/pc9y3im2v4yvz6n/Acceptance%20test%20criteria.xlsx?dl=0|Sheet]]. | |
Line 43: | Line 52: |
Agenda/Minutes of the VIS Meeting on 2020/9/25
2020/9/25 13:00 -
Participants:
Interface VIS+CRY
- Schedule
Progress report
General
Type-A
- [Fujii] Can you please update the status of paper writing especially about the Type-A mechanics and its control? I also would like to know the rough schedule that you team are planning. Please let me know. Leaving your comments here will be enough. O-tsu-ka-re-sa-ma-de-su. (My account will have to be removed I guess btw..)
Type-B
[Sato] Design of the limit switches for BS IP FR. BS IP FR limit switch_20200924.pdf
I submitted the paper to C&QG, finally.
- Hirata-san and I had an information session for Washimi-san.
- I asked to Takahashi-san for some long poles to mount the dial gauges around outer frames. Maybe there are some in TAMA. Work in progress.
- Given the new temperature conditions in the central room, I offloaded fishing rods:
SR2 (klog 15081) and SRM (klog 15083) fishing rods are working well.
BS: F0 and BF fishing rods look healthy and F1 one is at the bottom of its range (klog 15071).
SR3: F0 fishig rod is healthy, the F1 one is still jammed and BF one at its upper limit (klog 15070).
- I changed some DC filters setpoint and updated BURT and SDF files. In SR3 I keep the height of the mirror constant.
Type-Bp
Type-C
Controls
Electronics
Towards O4
- KAGRA is in "RSE Trial" now. "SEO is thinking about possibility for one week extension and the schedule reconstruction for vacuum chamber opening."
- Preparation work.
- The preparation work will be started on Oct. 1st.
Inventory sheet with the segment name is necessary (Example of Type-A).
- Procedure documents.
Criteria in the acceptance test Sheet.
- Presentation
- PAB (10/8)
- Chief Meeting (10/12)
Safety
Discussion
Travel Plans
The week from 9/28
- Takahashi: 9/30-10/2
- Sato: 9/30-10/2
- Hirata: 9/30-10/2
The week from 10/5
- Takahashi: 10/5-9
- Sato: 10/5-9
- Hirata: 10/5-9
Next meeting
- On 2020/10/2(Fri)