Differences between revisions 19 and 20
Revision 19 as of 2020-09-25 14:20:19
Size: 4510
Comment:
Revision 20 as of 2020-09-25 14:38:25
Size: 4574
Editor: naohisa.sato
Comment:
Deletions are marked like this. Additions are marked like this.
Line 35: Line 35:
  * Ordered the manufacture of a modified IMMT2 support frame.

Agenda/Minutes of the VIS Meeting on 2020/9/25

2020/9/25 13:00 -

Zoom Meeting

Participants:

Interface VIS+CRY

Progress report

General

Type-A

  • [Fujii] Can you please update the status of paper writing especially about the Type-A mechanics and its control? I also would like to know the rough schedule that you team are planning. Please let me know. Leaving your comments here will be enough. O-tsu-ka-re-sa-ma-de-su. (My account will have to be removed I guess btw..)

Type-B

  • [Sato] Design of the limit switches for BS IP FR. BS IP FR limit switch_20200924.pdf

  • I submitted the paper to C&QG, finally.

  • Hirata-san and I had an information session for Washimi-san.
  • I asked to Takahashi-san for some long poles to mount the dial gauges around outer frames. Maybe there are some in TAMA. Work in progress.
  • Given the new temperature conditions in the central room, I offloaded fishing rods:
    • SR2 (klog 15081) and SRM (klog 15083) fishing rods are working well.

    • BS: F0 and BF fishing rods look healthy and F1 one is at the bottom of its range (klog 15071).

    • SR3: F0 fishig rod is healthy, the F1 one is still jammed and BF one at its upper limit (klog 15070).

    • I changed some DC filters setpoint and updated BURT and SDF files. In SR3 I keep the height of the mirror constant.
  • For SR3 F1, I calculated the amount of ballast the needs to be removed to bring it to nominal height: 31 grams or less (klog 15102). This number has be reviewed once I calculate how much mass we need to remove from the IM. The BF fishing rod needs to be in mid-range with control off to know.

  • Next week:
    • Same calculation for the other filters: they require setting the fishing rods to mid-range.
    • With the new temperature conditions I need to measure IP resonant frequencies again.
    • LVDT card document

Type-Bp

Type-C

  • Ordered the manufacture of a modified IMMT2 support frame.

Controls

Electronics

Towards O4

Safety

Discussion

  • [Terrence] VIS health checking system VISHack

Travel Plans

The week from 9/28

  • Takahashi: 9/30-10/2
  • Sato: 9/30-10/2
  • Hirata: 9/30-10/2

The week from 10/5

  • Takahashi: 10/5-9
  • Sato: 10/5-9
  • Hirata: 10/5-9

Next meeting

  • On 2020/10/2(Fri)

KAGRA/Subgroups/VIS/VISMinutes20200925 (last edited 2020-09-25 15:50:46 by RyutaroTakahashi)