Line 12: Line 12:
 * Cable bandling bellow BF.  * Cable bandling bellow BF.[[attachment:Cable bandling BF-CRYO.pdf]]
Line 21: Line 21:
 * Sugiyama-san(ICRR, Uchiyama Lab.) will join VIS group, mainly for reinstallation of Type-A tower in Y-end.
 * [Takahashi, Miyo, Ikeda] We plan to test the heater control at the cross tube in IX or IY on Oct. 20-21.
Line 28: Line 30:
 * RSE Trial was extended to Oct. 7th.  * RSE Trial was extended to Oct. 12th.
Line 33: Line 35:
  * Inventory sheet with [[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0119/E2011960/002/KAGRA_Cleanbooth_Segment_Name.pdf|the segment name]] is necessary ([[https://www.dropbox.com/s/uz1ial5r377dgvt/Inventory%20check.xlsx?dl=0|Example of Type-A]]).   * Inventory sheet.
  * Cable removal.
Line 42: Line 45:
 * Criteria in the acceptance test [[https://www.dropbox.com/s/pc9y3im2v4yvz6n/Acceptance%20test%20criteria.xlsx?dl=0|Sheet]].  * Criteria in the acceptance test.

Agenda/Minutes on 2020/10/2

Zoom Meeting

CRY+VIS Interface Meeting

13:30-

Participants:

VIS Meeting

14:00-

Participants:

Progress report

General

  • Sugiyama-san(ICRR, Uchiyama Lab.) will join VIS group, mainly for reinstallation of Type-A tower in Y-end.
  • [Takahashi, Miyo, Ikeda] We plan to test the heater control at the cross tube in IX or IY on Oct. 20-21.

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 10/5

  • Takahashi: 10/7-10/9
  • Sato: 10/7-10/9
  • Hirata: 10/7-10/9

The week from 10/12

  • Takahashi: 10/12-16
  • Sato: 10/12-16
  • Hirata: 10/12-16

Next meeting

  • On 2020/10/9(Fri)