Differences between revisions 10 and 11
Revision 10 as of 2020-10-02 08:54:16
Size: 2393
Comment:
Revision 11 as of 2020-10-02 08:58:02
Size: 2488
Comment:
Deletions are marked like this. Additions are marked like this.
Line 22: Line 22:
 * [Takahashi, Miyo, Ikeda] We plan to test the heater control at the cross tube in IX or IY.

Agenda/Minutes on 2020/10/2

Zoom Meeting

CRY+VIS Interface Meeting

13:30-

Participants:

VIS Meeting

14:00-

Participants:

Progress report

General

  • Sugiyama-san(ICRR, Uchiyama Lab.) will join VIS group, mainly for reinstallation of Type-A tower in Y-end.
  • [Takahashi, Miyo, Ikeda] We plan to test the heater control at the cross tube in IX or IY.

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 10/5

  • Takahashi: 10/7-10/9
  • Sato: 10/7-10/9
  • Hirata: 10/7-10/9

The week from 10/12

  • Takahashi: 10/12-16
  • Sato: 10/12-16
  • Hirata: 10/12-16

Next meeting

  • On 2020/10/9(Fri)

KAGRA/Subgroups/VIS/VISMinutes20201002 (last edited 2020-10-02 15:20:34 by RyutaroTakahashi)