Differences between revisions 14 and 15
Revision 14 as of 2020-10-02 09:46:47
Size: 2561
Comment:
Revision 15 as of 2020-10-02 09:52:31
Size: 2678
Comment:
Deletions are marked like this. Additions are marked like this.
Line 37: Line 37:
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Schedule]]  * Schedule.
  * [[https://www.dropbox.com/s/4cgu0jwk3sykktp/ChamberOpen-Schedule201001-1-e.pdf?dl=0|Chamber opening]]
 
* [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|VIS]]

Agenda/Minutes on 2020/10/2

Zoom Meeting

CRY+VIS Interface Meeting

13:30-

Participants:

VIS Meeting

14:00-

Participants:

Progress report

General

  • Sugiyama-san(ICRR, Uchiyama Lab.) will join VIS group, mainly for reinstallation of Type-A tower in Y-end.
  • [Takahashi, Miyo, Ikeda] We plan to test the heater control at the cross tube in IX or IY on Oct. 20-21.

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 10/5

  • Takahashi: 10/7-10/9
  • Sato: 10/7-10/9
  • Hirata: 10/7-10/9

The week from 10/12

  • Takahashi: 10/12-16
  • Sato: 10/12-16
  • Hirata: 10/12-16

Next meeting

  • On 2020/10/9(Fri)

KAGRA/Subgroups/VIS/VISMinutes20201002 (last edited 2020-10-02 15:20:34 by RyutaroTakahashi)