Differences between revisions 4 and 5
Revision 4 as of 2020-09-30 16:36:38
Size: 2256
Editor: naohisa.sato
Comment:
Revision 5 as of 2020-09-30 16:37:08
Size: 2255
Editor: naohisa.sato
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
 * [[attachment:Cable bandling bellow BF.]]  * [[attachment:Cable bandling bellow BF]]

Agenda/Minutes on 2020/10/2

Zoom Meeting

CRY+VIS Interface Meeting

13:30-

Participants:

VIS Meeting

14:00-

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 10/5

  • Takahashi: 10/7-10/9
  • Sato: 10/7-10/9
  • Hirata: 10/7-10/9

The week from 10/12

  • Takahashi: 10/12-16
  • Sato: 10/12-16
  • Hirata: 10/12-16

Next meeting

  • On 2020/10/9(Fri)

KAGRA/Subgroups/VIS/VISMinutes20201002 (last edited 2020-10-02 15:20:34 by RyutaroTakahashi)