= Agenda/Minutes on 2020/10/9 = [[https://zoom.us/j/203743987|Zoom Meeting]] = CRY+VIS Interface Meeting = 13:40-14:10 Participants: Takahashi, Ohashi, Shoda, Hagiwara, Hirata, Ikeda, Miyo, Sato, Oshio, Ushiba, Kimura, Akutsu, Aso, Miyoki * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Upgrades/PostO3Upgrades|Post O3 Upgrade portal]] * Schedule on ETMY. * 11/2: Opening the chambers (top and cross tube), Fixing the IP and filters, Disconnection of the cables. 11/3: Disconnection of the cryo-payload. * MN oplev table design * Welding is not allowed in the tunnel. There are some ideas; gluing, flanges with extension, clamp to the view port. = VIS Meeting = 14:10-15:00 Participants: Takahashi, Shoda, Ishizaki, Fabian, Hitrata, Iguchi, Miyo, Tanaka, Sato, Sugiyama, Terrence, Aso == Progress report == === General === === Type-A === * Clean-up of the IXV and IYV area. === Type-B === * Clean-up of the BS and SR area. * Hirata-san asked for a quotation for 3 Top Filter keystone plates (for BS, SR3 and SR3 in case it's needed). * Fabian made progress in writing a document about LVDT card recovery. One more working day is needed. * We lost Hirose-san's lamps for checking cleanliness of mirrors. We'll keep looking for them. * We lost the medium capacity scale we used for ballast mass measurement. We need to buy one. I borrowed Miyoki-san's for a few days but he wants it back. === Type-Bp === === Type-C === === Controls === === Electronics === * Confirmation of exchange cables function in the new combiner. * Only two channels are available in the 1U chassis. == Towards O4 == * RSE Trial was extended to Oct. 12th. * Preparation work was started. * [[https://www.dropbox.com/s/t7dsw16qdc5pfrl/Booth%20cleaning%20rev.pdf?dl=0|Schedule and assignment of personnel]] * [[https://paper.dropbox.com/doc/Plan-for-cleaning-the-clean-booth--A73isqnLjN32leQb4nFiuN~BAg-KVEbnCCBASYy4ea78HBUH|Cleaning procedure]]. * [[https://www.dropbox.com/home/Subsystems/VIS/Inventory|Inventory sheet]]. * Turn-off for the power outage. Type-A/C: Takahashi, Type-B: Fabian, Type-Bp: Miyo * Schedule. * [[https://www.dropbox.com/s/1s5h7lb5t4ivd55/ChamberOpen-Schedule201002-1-e.pdf?dl=0|Chamber opening]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|VIS]] * Procedure documents. * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5500|Type-A tower installation]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11598|Limit switches]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11520|Limit switch connecting guide]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11978|Replacement of TF blades]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11878|Wire gluing in PR3]] * [[https://onedrive.live.com/?authkey=!AOLVVVKJ_Zpn-2c&cid=1447B05D5B571A84&id=1447B05D5B571A84!26691&parId=1447B05D5B571A84!26683&o=OneUp|Type-B remedying work]] * Criteria in the acceptance test. == Safety == == Discussion == [Terrence] Very short introduction to VISHack [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12125 | Slides]] == Travel Plans == The week from 10/12 * Takahashi: 10/12-16 * Sato: 10/12-16 * Hirata: 10/12-16 The week from 10/19 * Takahashi: 10/19-10/23 == Next meeting == * On 2020/10/16(Fri)