Line 7: Line 7:
Participants:  Participants:
Line 16: Line 16:
Participants:  Participants:
Line 20: Line 20:
 * I wrote a document about the procedure to replace the LVDT cards after a failure: [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12128|JGW-T2012128]].
  * It was checked by Alessandro Betolini from Nikhef and he says the method is correct. He provided minor comments that have been incorported to the new version of the document.
  * He says they will review the design for ETpathfinder and that's our chance to give them feedback (i.e. Tanaka-san's findings and my concerns as a user).
  * Knowledge transfer from Tanaka-san to Alessandro would be greatly beneficial for KAGRA. If you think it's suitable, would it be possible for someone to organize this, please?
 * Tanaka-san will take some of our LVDT cards for hardware modification.
  * We need to survey those LVDT cards before he takes them away. '''When will we do this?'''
  * As far as I understand, given the old calibration factor, he has to give us a procedure to calculate a new calibration factor. '''Is this statement correct?'''
  * Before any other card breaks, we need to survey all of them. '''When will we do this?'''
  * Four hands are required for the measurements. '''For Type-B/Bp, Washimi-san and Fabian can do it'''.
 * After cleaning the PR area I have the impression '''we lost Hirose-san's LED lamps''' to check mirror cleanliness.
Line 26: Line 37:
Line 33: Line 43:
  * Monitoring for vent. Date: 19(only EYV), 22-25(practically 22-23). Charge: Miyo, Ikeda, Fabian, Takahashi    * Monitoring for vent. Date: 19(only EYV), 22-25(practically 22-23). Charge: Miyo, Ikeda, Fabian, Takahashi
Line 48: Line 58:

Agenda/Minutes on 2020/10/16

Zoom Meeting

CRY+VIS Interface Meeting

13:30-

Participants:

VIS Meeting

14:00-

Participants:

Progress report

General

  • I wrote a document about the procedure to replace the LVDT cards after a failure: JGW-T2012128.

    • It was checked by Alessandro Betolini from Nikhef and he says the method is correct. He provided minor comments that have been incorported to the new version of the document.
    • He says they will review the design for ETpathfinder and that's our chance to give them feedback (i.e. Tanaka-san's findings and my concerns as a user).
    • Knowledge transfer from Tanaka-san to Alessandro would be greatly beneficial for KAGRA. If you think it's suitable, would it be possible for someone to organize this, please?
  • Tanaka-san will take some of our LVDT cards for hardware modification.
    • We need to survey those LVDT cards before he takes them away. When will we do this?

    • As far as I understand, given the old calibration factor, he has to give us a procedure to calculate a new calibration factor. Is this statement correct?

    • Before any other card breaks, we need to survey all of them. When will we do this?

    • Four hands are required for the measurements. For Type-B/Bp, Washimi-san and Fabian can do it.

  • After cleaning the PR area I have the impression we lost Hirose-san's LED lamps to check mirror cleanliness.

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 10/19

  • Takahashi: 10/19-10/23

The week from 10/26

  • Hirata: ?

Next meeting

  • On 2020/10/23(Fri)

KAGRA/Subgroups/VIS/VISMinutes20201016 (last edited 2020-10-16 15:48:19 by RyutaroTakahashi)