Differences between revisions 8 and 19 (spanning 11 versions)
Revision 8 as of 2020-10-16 13:09:07
Size: 3885
Comment:
Revision 19 as of 2020-10-16 15:43:01
Size: 5309
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
13:30- 13:30-14:00
Line 7: Line 7:
Participants: Participants: Takahashi, Sato, Hirata, Ikeda, Miyo, Hagiwara, Kimura, Aso, Tomaru, Ushiba, Akutsu
Line 12: Line 12:
 * IP monitoring improvement in vacuum pumping -> auto-tracking system
 * safe mode switching schedule of WAB
 * Yano-san's schedule
Line 14: Line 17:
14:00- 14:00-15:30
Line 16: Line 19:
Participants: Participants: Takahashi, Fabian, Hirata, Iguchi, Ishizaki, Miyo, Tanaka, Sato, Suguyama, Terrence, Aso
Line 33: Line 36:
[Washimi]

 * [[https://app.holobuilder.com/app/?p=6610079827099648|Cleaning results]]
Line 34: Line 41:
 * We went to clean-up of each clean booth.
Line 36: Line 45:
 * We continued with the cleaning.  * We finished the cleaning with a lot of help.
Line 40: Line 49:
 * We recovered the suspensions after blackout. They all went to ALIGNED state well.
 * The temperature has decreased a lot inside the clean rooms, likely due to an increase of cold air circulation after turning all FFUs on. A couple of DC control loops in GAS filters are about to saturate. I've reported this to Miyoki-san and he turned on some heaters.
Line 42: Line 53:
 * After the blackout PR2 went to ALIGNED state well. PR3 and PRM oplevs were removed before recovery and I just checked they went to TWR_DAMPED state. I can turn the IM control system on by hand to check the health of IM-OSEMS.
 * Just for the record for new comers: I realized PR use different amplitudes of reference signals for the LVDTs. According to labels attached to signals generators:
  * PR2: 6 Vpp.
  * PR3 and PRM: 7 Vpp.
Line 45: Line 61:
 * More three channels are not available in 1U chassis. 2U chassis are necessary with bridge cable.
Line 52: Line 70:
  * Guardian update is planed on 21 in PR and BS.

Agenda/Minutes on 2020/10/16

Zoom Meeting

CRY+VIS Interface Meeting

13:30-14:00

Participants: Takahashi, Sato, Hirata, Ikeda, Miyo, Hagiwara, Kimura, Aso, Tomaru, Ushiba, Akutsu

VIS Meeting

14:00-15:30

Participants: Takahashi, Fabian, Hirata, Iguchi, Ishizaki, Miyo, Tanaka, Sato, Suguyama, Terrence, Aso

Progress report

General

[Fabian]

  • I wrote a document about the procedure to replace the LVDT cards after a failure: JGW-T2012128.

    • It was checked by Alessandro Betolini from Nikhef and he says the method is correct. He provided minor comments that have been incorported to the new version of the document.
    • He says they will review the design for ETpathfinder and that's our chance to give them feedback (i.e. Tanaka-san's findings and my concerns as a user).
    • Knowledge transfer from Tanaka-san to Alessandro would be greatly beneficial for KAGRA. If you think it's suitable, would it be possible for someone to organize this, please?
  • Tanaka-san will take some of our LVDT cards for hardware modification.
    • We need to survey those LVDT cards before he takes them away. When will we do this?

    • As far as I understand, given the old calibration factor, he has to give us a procedure to calculate a new calibration factor. Is this statement correct?

    • Before any other card breaks, we need to survey all of them. When will we do this?

    • Four hands are required for the measurements. For Type-B/Bp, Washimi-san and Fabian can do it.

  • After cleaning the PR area I have the impression we lost Hirose-san's LED lamps to check mirror cleanliness.

[Washimi]

Type-A

  • We went to clean-up of each clean booth.

Type-B

  • I gave some feedback for the noise budget paper.
  • We finished the cleaning with a lot of help.
  • Hirata-san made M6 holes in some ballast masses.
  • We removed some cables from chassis for the cleaning procedure.
  • I put the fibre optic camera in the PR clean booth buffer area.
  • We recovered the suspensions after blackout. They all went to ALIGNED state well.
  • The temperature has decreased a lot inside the clean rooms, likely due to an increase of cold air circulation after turning all FFUs on. A couple of DC control loops in GAS filters are about to saturate. I've reported this to Miyoki-san and he turned on some heaters.

Type-Bp

  • After the blackout PR2 went to ALIGNED state well. PR3 and PRM oplevs were removed before recovery and I just checked they went to TWR_DAMPED state. I can turn the IM control system on by hand to check the health of IM-OSEMS.
  • Just for the record for new comers: I realized PR use different amplitudes of reference signals for the LVDTs. According to labels attached to signals generators:
    • PR2: 6 Vpp.
    • PR3 and PRM: 7 Vpp.

Type-C

Controls

Electronics

  • More three channels are not available in 1U chassis. 2U chassis are necessary with bridge cable.

Towards O4

Safety

Discussion

Travel Plans

The week from 10/19

  • Takahashi: 10/19-10/23

The week from 10/26

  • Hirata: ?

Next meeting

  • On 2020/10/23(Fri)

KAGRA/Subgroups/VIS/VISMinutes20201016 (last edited 2020-10-16 15:48:19 by RyutaroTakahashi)