* Schedule of safe mode switching for WAB * Schedule of the wire disconnection: EY 11/3, IX 11/26, EX 11/27 * Schedule of the FC painting. |
|
Line 12: | Line 15: |
* safe mode switching schedule of WAB * Schedule of the wire disconnection: EY 11/3, IX 11/26, EX 11/27 |
|
Line 18: | Line 19: |
Participants: | Participants: |
Line 23: | Line 24: |
* Set up the ribbon heaters in IX for the temperature control test. But the test conflicted with the vent of chamber. --> Move to EX and test them in the next week. * We used Ikeda-san's and Miyo-kun's script for moving IPs with fishing rods during venting. It works very well and the interface is very good. |
|
Line 24: | Line 28: |
[Fabian] * On Saturday Miyo-kun, Washimi-san and Fabian went to the tunnel and rerouted and reconnected cables in SR suspensions (IP and GAS LVDTs and FRs). We also reconnected the coil cables in BS OSEM satellite boxes for Guardian test. * Fabian confirmed the cabling was fine by using the fishng rods and monitoring motion with the LVDTs. I wrote the polarity down for Ikeda-san to use. See klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15272|15272]]. * Miyo-kun confirmed the new Guardian works for BS suspension. See klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15276|15276]]. * Hirata-san and I gave some feedback to Matteo about how we helped Hirose-san with the cleanliness of the mirrors before O3GK. * In the context of Ikeda-san's work with stepper motor scripts, together with Miyo-kun I revisited the IP fishing rods transformation matrices. * Before venting of the central room Fabian set the IPs and GAS filters in suitable positions (various klog reports). In the case of GAS filters it's useful to measure the keystone displacement due to bouyancy. * I checked SRM BF condition on Wednesday before the venting. See klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15305|15305]]. In previous analysis, it seemed the keystone hit a hard physical stop because it stopped moving when lowered. However, '''on Wednesday it didn't stop moving, but an oscillation at 40 mHz appeared. Currently I especulate it's a cable pulling.''' * I monitored the Type-B suspensions during venting. See klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15307|15307]]. I'll report the size of the bouyancy correction next week. * I wrote a To DO list for next week in Github: [[https://github.com/gw-vis/kagra-vis/issues/85|Type-B TODO list]]. * Akutsu-san removed oplevs from SR suspensions as preparation to duct removal by Mirapro. |
|
Line 25: | Line 42: |
* As preparation for duct removal by Mirapro, we disconnected cables from PR2 small rack inside of the clean room and move it away from the chamber. |
|
Line 26: | Line 45: |
* (sato)No progress |
|
Line 28: | Line 49: |
Line 33: | Line 53: |
* Monitoring for vent. Date: 19(EY), 21(IX, IY, EY), 22(Center). Charge: Miyo, Ikeda, Fabian, Takahashi * Guardian update is planed on 21 in PR and BS. |
* Monitoring for vent. Date: 19(EY), 21(IX, IY, EY), 22(IX, IY, EY, Center), 23(Center). Charge: Miyo, Ikeda, Fabian * New guardian test on 19 in PR2 and BS. |
Line 53: | Line 73: |
* Takahashi: 10/26-28 | |
Line 54: | Line 75: |
The week from 10/19 | The week from 11/2 |
Line 58: | Line 79: |
* Hirata: 11/2-6 | * Hirata: 11/1-6 |
Agenda/Minutes on 2020/10/23
CRY+VIS Interface Meeting
13:30-14:00
Participants:
- Schedule of safe mode switching for WAB
- Schedule of the wire disconnection: EY 11/3, IX 11/26, EX 11/27
- Schedule of the FC painting.
- PF actuator
IP monitoring improvement in vacuum pumping -> auto-tracking system
VIS Meeting
14:00-
Participants:
Progress report
General
Type-A
Set up the ribbon heaters in IX for the temperature control test. But the test conflicted with the vent of chamber. --> Move to EX and test them in the next week.
- We used Ikeda-san's and Miyo-kun's script for moving IPs with fishing rods during venting. It works very well and the interface is very good.
Type-B
[Fabian]
- On Saturday Miyo-kun, Washimi-san and Fabian went to the tunnel and rerouted and reconnected cables in SR suspensions (IP and GAS LVDTs and FRs). We also reconnected the coil cables in BS OSEM satellite boxes for Guardian test.
- Hirata-san and I gave some feedback to Matteo about how we helped Hirose-san with the cleanliness of the mirrors before O3GK.
- In the context of Ikeda-san's work with stepper motor scripts, together with Miyo-kun I revisited the IP fishing rods transformation matrices.
- Before venting of the central room Fabian set the IPs and GAS filters in suitable positions (various klog reports). In the case of GAS filters it's useful to measure the keystone displacement due to bouyancy.
I checked SRM BF condition on Wednesday before the venting. See klog 15305. In previous analysis, it seemed the keystone hit a hard physical stop because it stopped moving when lowered. However, on Wednesday it didn't stop moving, but an oscillation at 40 mHz appeared. Currently I especulate it's a cable pulling.
I monitored the Type-B suspensions during venting. See klog 15307. I'll report the size of the bouyancy correction next week.
I wrote a To DO list for next week in Github: Type-B TODO list.
- Akutsu-san removed oplevs from SR suspensions as preparation to duct removal by Mirapro.
Type-Bp
- As preparation for duct removal by Mirapro, we disconnected cables from PR2 small rack inside of the clean room and move it away from the chamber.
Type-C
- (sato)No progress
Controls
Electronics
Towards O4
- Chamber opening will be started from Oct. 26.
- Preparation work is on going.
- Monitoring for vent. Date: 19(EY), 21(IX, IY, EY), 22(IX, IY, EY, Center), 23(Center). Charge: Miyo, Ikeda, Fabian
- New guardian test on 19 in PR2 and BS.
- Schedule.
- Procedure documents.
- Criteria in the acceptance test.
Safety
Discussion
Travel Plans
The week from 10/26
- Hirata: 10/26-30
- Takahashi: 10/26-28
The week from 11/2
- Takahashi: 11/1-6
- Sato: 11/1-6
- Hirata: 11/1-6
Next meeting
- On 2020/10/30(Fri)