Line 5: Line 5:
13:30-14:00 13:30-14:15
Line 7: Line 7:
Participants: Participants: Takahashi, Miyo, Ikeda, Hirata, Hagiwara, Aso, Matteo, Akutsu, Tomaru, Ushiba
Line 10: Line 10:
 * Schedule of safe mode switching for WAB
 * Schedule of the wire disconnection: EY 11/3, IX 11/26, EX 11/27
 * Schedule of safe mode switching for WAB: in 3 days
 * Schedule of the wire disconnection: EY 11/3, IX and EX should be rearranged (Meeting on 11/27).
Line 13: Line 13:
 * PF actuator
* IP monitoring improvement in vacuum pumping -> auto-tracking system
 * IP monitoring improvement in vacuum pumping -> auto-tracking system: Test in the next venting on 11/4 and 11/20.
Line 17: Line 16:
14:00- 14:00-15:00
Line 19: Line 18:
Participants: Participants: Takahashi, Miyo, Ikeda, Fabian, Hirata, Iguchi, Tanaka, Sugiyama, Terrence, Washimi, Aso
Line 23: Line 22:
 * We used Ikeda-san's and Miyo-kun's script for moving IPs with fishing rods during venting. It works very well and the interface is very good.
Line 25: Line 26:
 * We used Ikeda-san's and Miyo-kun's script for moving IPs with fishing rods during venting. It works very well and the interface is very good.  * Ikeda-san, Miyo-kun and Fabian monitored the IPs during venting.
Line 37: Line 38:
 * I monitored the Type-B suspensions during venting. See klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15307|15307]]. I'll report the size of the bouyancy correction next week.  * Miyo-kun and I monitored the Type-B suspensions during venting. See klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15307|15307]]. I'll report the size of the bouyancy correction next week.
Line 49: Line 50:
 * Design for the test board was finished. The board and parts will be ordered soon.
 * The cost of two units for 3ch is about 600,000Yen. It is necessary to reduce the number of units in this FY.

Agenda/Minutes on 2020/10/23

Zoom Meeting

CRY+VIS Interface Meeting

13:30-14:15

Participants: Takahashi, Miyo, Ikeda, Hirata, Hagiwara, Aso, Matteo, Akutsu, Tomaru, Ushiba

  • Post O3 Upgrade portal

  • Schedule of safe mode switching for WAB: in 3 days
  • Schedule of the wire disconnection: EY 11/3, IX and EX should be rearranged (Meeting on 11/27).
  • Schedule of the FC painting.
  • IP monitoring improvement in vacuum pumping -> auto-tracking system: Test in the next venting on 11/4 and 11/20.

VIS Meeting

14:00-15:00

Participants: Takahashi, Miyo, Ikeda, Fabian, Hirata, Iguchi, Tanaka, Sugiyama, Terrence, Washimi, Aso

Progress report

General

  • We used Ikeda-san's and Miyo-kun's script for moving IPs with fishing rods during venting. It works very well and the interface is very good.

Type-A

  • Set up the ribbon heaters in IX for the temperature control test. But the test conflicted with the vent of chamber. --> Move to EX and test them in the next week.

  • Ikeda-san, Miyo-kun and Fabian monitored the IPs during venting.

Type-B

[Fabian]

  • On Saturday Miyo-kun, Washimi-san and Fabian went to the tunnel and rerouted and reconnected cables in SR suspensions (IP and GAS LVDTs and FRs). We also reconnected the coil cables in BS OSEM satellite boxes for Guardian test.
    • Fabian confirmed the cabling was fine by using the fishng rods and monitoring motion with the LVDTs. I wrote the polarity down for Ikeda-san to use. See klog 15272.

    • Miyo-kun confirmed the new Guardian works for BS suspension. See klog 15276.

  • Hirata-san and I gave some feedback to Matteo about how we helped Hirose-san with the cleanliness of the mirrors before O3GK.
  • In the context of Ikeda-san's work with stepper motor scripts, together with Miyo-kun I revisited the IP fishing rods transformation matrices.
  • Before venting of the central room Fabian set the IPs and GAS filters in suitable positions (various klog reports). In the case of GAS filters it's useful to measure the keystone displacement due to bouyancy.
  • I checked SRM BF condition on Wednesday before the venting. See klog 15305. In previous analysis, it seemed the keystone hit a hard physical stop because it stopped moving when lowered. However, on Wednesday it didn't stop moving, but an oscillation at 40 mHz appeared. Currently I especulate it's a cable pulling.

  • Miyo-kun and I monitored the Type-B suspensions during venting. See klog 15307. I'll report the size of the bouyancy correction next week.

  • I wrote a To DO list for next week in Github: Type-B TODO list.

  • Akutsu-san removed oplevs from SR suspensions as preparation to duct removal by Mirapro.

Type-Bp

  • As preparation for duct removal by Mirapro, we disconnected cables from PR2 small rack inside of the clean room and move it away from the chamber.

Type-C

  • (sato)No progress

Controls

Electronics

  • Design for the test board was finished. The board and parts will be ordered soon.
  • The cost of two units for 3ch is about 600,000Yen. It is necessary to reduce the number of units in this FY.

Towards O4

Safety

Discussion

Travel Plans

The week from 10/26

  • Hirata: 10/26-30
  • Takahashi: 10/26-28

The week from 11/2

  • Takahashi: 11/1-6
  • Sato: 11/1-6
  • Hirata: 11/1-6

Next meeting

  • On 2020/10/30(Fri)