Differences between revisions 7 and 8
Revision 7 as of 2020-10-22 10:01:05
Size: 2259
Comment:
Revision 8 as of 2020-10-22 12:14:51
Size: 2281
Editor: naohisa.sato
Comment:
Deletions are marked like this. Additions are marked like this.
Line 26: Line 26:
 * (sato)No progress

Agenda/Minutes on 2020/10/23

Zoom Meeting

CRY+VIS Interface Meeting

13:30-14:00

Participants:

  • Post O3 Upgrade portal

  • Schedule of safe mode switching for WAB
  • Schedule of the wire disconnection: EY 11/3, IX 11/26, EX 11/27
  • PF actuator
  • IP monitoring improvement in vacuum pumping -> auto-tracking system

VIS Meeting

14:00-

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

  • (sato)No progress

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 10/26

  • Hirata: 10/26-30

The week from 11/2

  • Takahashi: 11/1-6
  • Sato: 11/1-6
  • Hirata: 11/1-6

Next meeting

  • On 2020/10/30(Fri)

KAGRA/Subgroups/VIS/VISMinutes20201023 (last edited 2020-10-23 15:24:10 by RyutaroTakahashi)