Differences between revisions 1 and 5 (spanning 4 versions)
Revision 1 as of 2020-10-28 11:21:26
Size: 1858
Comment:
Revision 5 as of 2020-10-29 15:16:11
Size: 1882
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
 * FC painting.
Line 24: Line 25:
[Sato] IMMT2 modification parts was delivered at Oct.28.
Line 28: Line 31:
 * Chamber opening is on going.  * Chamber opening and DGS update are on going.
Line 30: Line 33:
  * [[https://www.dropbox.com/s/1s5h7lb5t4ivd55/ChamberOpen-Schedule201002-1-e.pdf?dl=0|Chamber opening]]   * Arrangement of personnel in Nov.
Line 53: Line 56:
 * Sato: 11/9-13  * Sato: 11/9-12

Agenda/Minutes on 2020/10/30

Zoom Meeting

CRY+VIS Interface Meeting

13:30-

Participants:

  • Post O3 Upgrade portal

  • Schedule: Wire disconnection, WAB safe mode.
  • FC painting.
  • IP monitoring in the next venting on 11/4 and 11/20.

VIS Meeting

14:00-

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

[Sato] IMMT2 modification parts was delivered at Oct.28.

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 11/2

  • Takahashi: 11/1-6
  • Sato: 11/1-6
  • Hirata: 11/1-6

The week from 11/9

  • Takahashi: 11/9-13
  • Sato: 11/9-12
  • Hirata: 11/9-13

Next meeting

  • On 2020/11/6(Fri)