Differences between revisions 5 and 6
Revision 5 as of 2020-10-29 15:16:11
Size: 1882
Comment:
Revision 6 as of 2020-10-29 15:16:45
Size: 1882
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
13:30- 13:00-

Agenda/Minutes on 2020/10/30

Zoom Meeting

CRY+VIS Interface Meeting

13:00-

Participants:

  • Post O3 Upgrade portal

  • Schedule: Wire disconnection, WAB safe mode.
  • FC painting.
  • IP monitoring in the next venting on 11/4 and 11/20.

VIS Meeting

14:00-

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

[Sato] IMMT2 modification parts was delivered at Oct.28.

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 11/2

  • Takahashi: 11/1-6
  • Sato: 11/1-6
  • Hirata: 11/1-6

The week from 11/9

  • Takahashi: 11/9-13
  • Sato: 11/9-12
  • Hirata: 11/9-13

Next meeting

  • On 2020/11/6(Fri)

KAGRA/Subgroups/VIS/VISMinutes20201030 (last edited 2020-10-30 15:04:14 by RyutaroTakahashi)