* Cryo-payload was disconnected on 11/3 and the wire was taken down under the cross tube on 11/5 in Y-end. * The L-parts and tie-rods in IYV were replaced. The effects will be checked on 11/20. |
|
Line 12: | Line 14: |
* IP monitoring on 11/8(EX) and 11/20(IY). | |
Line 36: | Line 37: |
* [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11598|Limit switches]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11520|Limit switch connecting guide]] <-- revised by Ikeda-san |
* [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11598|Limit switches]] <-- Revised. Small changes in assembly (add one more nut) * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11520|Limit switch connecting guide]] |
Agenda/Minutes on 2020/11/6
CRY+VIS Interface Meeting
13:30-
Participants:
- Cryo-payload was disconnected on 11/3 and the wire was taken down under the cross tube on 11/5 in Y-end.
- The L-parts and tie-rods in IYV were replaced. The effects will be checked on 11/20.
- Schedule: Wire disconnection (IX 11/13, EX 11/19), WAB safe mode (10/26-11/13).
- Jig for the FC painting.
- PF actuator: Measurement of coefficients and calculation of the noise (by mid Dec.).
VIS Meeting
14:00-
Participants:
Progress report
General
Type-A
Type-B
Type-Bp
Type-C
Controls
Electronics
Towards O4
- DGS update are on going.
- Schedule.
- Procedure documents.
Limit switches <-- Revised. Small changes in assembly (add one more nut)
- Criteria in the acceptance test.
Safety
Discussion
Travel Plans
The week from 11/9
- Takahashi: 11/9-13
- Sato: 11/9-12
- Hirata: 11/9-13
The week from 11/16
- Takahashi: 11/16-20
- Sato: 11/16-20
- Hirata: 11/16-20
Next meeting
- On 2020/11/13(Fri)