 * Cryo-payload was disconnected on 3rd and the wire was taken down under the cross tube on 5th.

Agenda/Minutes on 2020/11/6

Zoom Meeting

CRY+VIS Interface Meeting

13:30-

Participants:

  • Post O3 Upgrade portal

  • Cryo-payload was disconnected on 3rd and the wire was taken down under the cross tube on 5th.
  • Schedule: Wire disconnection (IX 11/13, EX 11/19), WAB safe mode (10/26-11/13).
  • Jig for the FC painting.
  • IP monitoring on 11/8(EX) and 11/20(IY).
  • PF actuator: Measurement of coefficients and calculation of the noise (by mid Dec.).

VIS Meeting

14:00-

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 11/9

  • Takahashi: 11/9-13
  • Sato: 11/9-12
  • Hirata: 11/9-13

The week from 11/16

  • Takahashi: 11/16-20
  • Sato: 11/16-20
  • Hirata: 11/16-20

Next meeting

  • On 2020/11/13(Fri)