Washimi-san, Akutsu-san, Miyo-kun, Sugiyama, Fabian. * After Shimode-san fixed a minor problem with one of PR2 LVDT drivers, we installed it back and it worked! * We measured the phases again. The results of almost all LVDT drivers used in PR suspensions are reported in klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15457|15457]]. * PRM BF recoil mass LVDT cards have not been examined because we need the problem with the misconnected cables solved. * One resistance in PRM SF GAS LVDT channel seems anomalous: it's value is only 1.2 Ohm whereas typical values are larger than 5 kOhm. * PRM oplev breadboard with optics was installed on the pylon. They will turn the SLED on next week. See klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15449|15449]]. |
|
Line 26: | Line 34: |
* [Sato](no progress) |
|
Line 56: | Line 66: |
* Sato: ? | * Sato: 11/24-27 |
Agenda/Minutes on 2020/11/13
CRY+VIS Interface Meeting
13:30-14:00
Participants:
- Disassembly of the Type-A tower was finished in Y-end (11/11).
- Schedule: Wire disconnection (IX 11/13, EX 11/19), Chamber evacuation (IY 11/20).
- Jig for the FC painting.
PF actuator: Measurement of coefficients --> calculation of the noise (by mid Dec.).
VIS Meeting
14:00-
Participants:
Progress report
General
Type-A
Type-B
Type-Bp
Washimi-san, Akutsu-san, Miyo-kun, Sugiyama, Fabian.
- After Shimode-san fixed a minor problem with one of PR2 LVDT drivers, we installed it back and it worked!
We measured the phases again. The results of almost all LVDT drivers used in PR suspensions are reported in klog 15457.
- PRM BF recoil mass LVDT cards have not been examined because we need the problem with the misconnected cables solved.
- One resistance in PRM SF GAS LVDT channel seems anomalous: it's value is only 1.2 Ohm whereas typical values are larger than 5 kOhm.
PRM oplev breadboard with optics was installed on the pylon. They will turn the SLED on next week. See klog 15449.
Type-C
- [Sato](no progress)
Controls
Electronics
Towards O4
- Type-B remedy work will be started on 11/16.
- Schedule.
- Procedure documents.
- Criteria in the acceptance test.
Safety
Discussion
Travel Plans
The week from 11/16
- Takahashi: 11/16-20
- Sato: 11/16-20
- Hirata: 11/16-20
The week from 11/23
- Aso: 11/24-27
- Takahashi: 11/24-27
- Hirata: 11/24-27
- Sato: 11/24-27
Next meeting
- On 2020/11/20(Fri)