Washimi-san, Akutsu-san, Miyo-kun, Sugiyama, Fabian.

 * After Shimode-san fixed a minor problem with one of PR2 LVDT drivers, we installed it back and it worked!
 * We measured the phases again. The results of almost all LVDT drivers used in PR suspensions are reported in klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15457|15457]].
  * PRM BF recoil mass LVDT cards have not been examined because we need the problem with the misconnected cables solved.
  * One resistance in PRM SF GAS LVDT channel seems anomalous: it's value is only 1.2 Ohm whereas typical values are larger than 5 kOhm.
 * PRM oplev breadboard with optics was installed on the pylon. They will turn the SLED on next week. See klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15449|15449]].
Line 27: Line 35:

Agenda/Minutes on 2020/11/13

Zoom Meeting

CRY+VIS Interface Meeting

13:30-14:00

Participants:

  • Post O3 Upgrade portal

  • Disassembly of the Type-A tower was finished in Y-end (11/11).
  • Schedule: Wire disconnection (IX 11/13, EX 11/19), Chamber evacuation (IY 11/20).
  • Jig for the FC painting.
  • PF actuator: Measurement of coefficients --> calculation of the noise (by mid Dec.).

VIS Meeting

14:00-

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Washimi-san, Akutsu-san, Miyo-kun, Sugiyama, Fabian.

  • After Shimode-san fixed a minor problem with one of PR2 LVDT drivers, we installed it back and it worked!
  • We measured the phases again. The results of almost all LVDT drivers used in PR suspensions are reported in klog 15457.

    • PRM BF recoil mass LVDT cards have not been examined because we need the problem with the misconnected cables solved.
    • One resistance in PRM SF GAS LVDT channel seems anomalous: it's value is only 1.2 Ohm whereas typical values are larger than 5 kOhm.
  • PRM oplev breadboard with optics was installed on the pylon. They will turn the SLED on next week. See klog 15449.

Type-C

  • [Sato](no progress)

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 11/16

  • Takahashi: 11/16-20
  • Sato: 11/16-20
  • Hirata: 11/16-20

The week from 11/23

  • Aso: 11/24-27
  • Takahashi: 11/24-27
  • Hirata: 11/24-27
  • Sato: 11/24-27

Next meeting

  • On 2020/11/20(Fri)