Line 10: Line 10:
 * Evacuation of EYC was started on 11/18.
 * Schedule: Wire disconnection (EX 11/19), Chamber evacuation (IY 11/20).
 * Evacuation of EYC was started on 18th.
 * The wire was disconnected from the cryo-payload in EX on
19th.
 * Schedule: Chamber evacuation in IY on 20th.

Agenda/Minutes on 2020/11/20

Zoom Meeting

CRY+VIS Interface Meeting

13:30-

Participants:

  • Post O3 Upgrade portal

  • Evacuation of EYC was started on 18th.
  • The wire was disconnected from the cryo-payload in EX on 19th.
  • Schedule: Chamber evacuation in IY on 20th.
  • Jig for the FC painting.
  • PF actuator: Measurement of coefficients --> calculation of the noise (by mid Dec.).

VIS Meeting

14:00-

Participants:

Progress report

General

Type-A

  • Closed the feedthrough flanges on the top chamber in EY. The chamber was evacuated from 18th.
  • Assembled the side stoppers and replaced the side plates on the BF in EY.
  • Disconnected the wire from the cryo-payload in EX. The cable for the TF actuator was broken and one magnet dropped into the corrugate tube during the work.
  • Released the jack for the top chamber in IY.

[Type-A paper] Then what is going on about the paper reviewing... My JGW account looks unavailable now and I cannot collect much information about the current publication rules or so. How should I work on ... (Y. Fujii)

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 11/23

  • Aso: 11/23-27
  • Takahashi: 11/24-27
  • Hirata: 11/24-27
  • Sato: 11/24-27

The week from 11/30

  • Takahashi: 11/30-12/4
  • Sato: 11/30-12/4
  • Hirata: 11/30-12/4

Next meeting

  • On 2020/11/27(Fri)