Agenda/Minutes on 2020/11/27
CRY+VIS Interface Meeting
13:30-
Participants:
- Leak test of EYC.
- Evacuation of IYC.
- Jig for the FC painting.
- The connection/disconnection schedule.
- Disconnection: ITMY by 2/26
- Connection: ITMX after 3/2, ITMY after 3/30, ETMX after 1/12, ETMY after 5/4
PF actuator: Measurement of coefficients --> calculation of the noise (by mid Dec.).
VIS Meeting
14:00-
Participants:
Progress report
General
Type-A
- IYC chamber was evacuated. The height of top chamber went down by 1mm.
Type-B
Type-Bp
Type-C
Controls
Electronics
Towards O4
- Type-B remedy work is on going.
- Schedule.
- Procedure documents.
- Criteria in the acceptance test.
Safety
Discussion
[Terrence] I would like to know the availability of the Type-B (or even Type-A) suspensions. I will be actively working on testing my methods on sensor corrections, complementary filters, and control optimization. I am also writing a paper on complementary filters so I will be collecting data from the suspensions.
Travel Plans
The week from 11/30
- Takahashi: 11/30-12/4
- Hirata: 11/30-12/4
- Sato: ?
The week from 12/7
- Takahashi: 12/7-11
- Hirata: 12/7-11
Next meeting
- On 2020/12/4(Fri)