Differences between revisions 8 and 9
Revision 8 as of 2020-11-27 12:58:08
Size: 2374
Comment:
Revision 9 as of 2020-11-27 13:00:42
Size: 2414
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
 * Evacuation of IYC.  * Evacuation of IYC. Height change: top chamber 1mm, BF 5mm.

Agenda/Minutes on 2020/11/27

Zoom Meeting

CRY+VIS Interface Meeting

13:30-

Participants:

  • Post O3 Upgrade portal

  • Leak test and removal of cryo-payload in EY.
  • Evacuation of IYC. Height change: top chamber 1mm, BF 5mm.
  • Jig for the FC painting.
  • The connection/disconnection schedule.
    • Disconnection: ITMY by 2/26
    • Connection: ITMX after 3/2, ITMY after 3/30, ETMX after 1/12, ETMY after 5/4
  • PF actuator: Measurement of coefficients --> calculation of the noise (by mid Dec.).

VIS Meeting

14:00-

Participants:

Progress report

General

Type-A

  • IYC chamber was evacuated. The height of top chamber went down by 1mm.

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

[Terrence] I would like to know the availability of the Type-B (or even Type-A) suspensions. I will be actively working on testing my methods on sensor corrections, complementary filters, and control optimization. I am also writing a paper on complementary filters so I will be collecting data from the suspensions.

Travel Plans

The week from 11/30

  • Takahashi: 11/30-12/4
  • Hirata: 11/30-12/4
  • Sato: ?

The week from 12/7

  • Takahashi: 12/7-11
  • Hirata: 12/7-11

Next meeting

  • On 2020/12/4(Fri)

KAGRA/Subgroups/VIS/VISMinutes20201127 (last edited 2020-11-28 15:17:30 by RyutaroTakahashi)