Size: 1872
Comment:
|
Size: 2377
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 9: | Line 9: |
* [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Upgrades/PostO3Upgrades|Post O3 Upgrade portal]] | [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Upgrades/PostO3Upgrades|Post O3 Upgrade portal]] * Schedule: Upgrade work in IXV (2/22-3/10) will be swapped with the work in EXV (1/4-1/22). The connection of ITMX is available on 1/12. |
Line 11: | Line 13: |
* The connection/disconnection schedule. | |
Line 26: | Line 27: |
* Set up the old OSTM suspension in the OMC both. |
|
Line 28: | Line 31: |
* Tested the modified LVDT card. This modification (#14 pin grounded) will be applied to 16 cards. | |
Line 32: | Line 36: |
* [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|VIS]] | * Upgrade work in IXV (2/22-3/10) will be swapped with the work in EXV (1/4-1/22). ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Chart]]) |
Line 36: | Line 40: |
* [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11520|Limit switch connecting guide]] <-- Corrected page14 on 11.25 | * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11520|Limit switch connecting guide]] |
Line 41: | Line 45: |
* [[https://www.dropbox.com/s/6bv15yy6hg0wn40/Acceptance%20Test%20Documentation.docx?dl=0|Inspection document (sample)]] | |
Line 44: | Line 49: |
* Mechanical resonances of SRM. | |
Line 50: | Line 56: |
* Yano: 12/7-11 | |
Line 55: | Line 62: |
* Yano: 12/14-18 | |
Line 56: | Line 64: |
(F2F Meeting in 17-18) | (F2F Meeting in 12/17-18) |
Agenda/Minutes on 2020/12/4
CRY+VIS Interface Meeting
13:30-
Participants:
- Schedule: Upgrade work in IXV (2/22-3/10) will be swapped with the work in EXV (1/4-1/22). The connection of ITMX is available on 1/12.
- Jig for the FC painting.
- Acceptance check items.
PF actuator: Measurement of coefficients --> calculation of the noise (by the end of Jan.).
VIS Meeting
14:00-
Participants:
Progress report
General
Type-A
Type-B
Type-Bp
Type-C
- Set up the old OSTM suspension in the OMC both.
Controls
Electronics
- Tested the modified LVDT card. This modification (#14 pin grounded) will be applied to 16 cards.
Towards O4
- Type-B remedy work is on going.
- Schedule.
Upgrade work in IXV (2/22-3/10) will be swapped with the work in EXV (1/4-1/22). (Chart)
- Procedure documents.
- Criteria in the acceptance test.
Safety
Discussion
- Mechanical resonances of SRM.
Travel Plans
The week from 12/7
- Takahashi: 12/7-11
- Hirata: 12/7-11
- Yano: 12/7-11
The week from 12/14
- Takahashi: 12/14-18
- Hirata: 12/14-18
- Yano: 12/14-18
(F2F Meeting in 12/17-18)
Next meeting
- On 2020/12/11(Fri)