  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|VIS]]   * Upgrade work in IX (2/22-3/10) will be swapped with the work in EX (1/4-1/22). The connection of ITMX is available on 1/12.([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Chart]])

Agenda/Minutes on 2020/12/4

Zoom Meeting

CRY+VIS Interface Meeting

13:30-

Participants:

  • Post O3 Upgrade portal

  • Schedule: Upgrade work in IX (2/22-3/10) will be swapped with the work in EX (1/4-1/22). The connection of ITMX is available on 1/12.
  • Jig for the FC painting.
  • Acceptance check items.
  • PF actuator: Measurement of coefficients --> calculation of the noise (by the end of Jan.).

VIS Meeting

14:00-

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 12/7

  • Takahashi: 12/7-11
  • Hirata: 12/7-11

The week from 12/14

  • Takahashi: 12/14-18
  • Hirata: 12/14-18

(F2F Meeting in 17-18)

Next meeting

  • On 2020/12/11(Fri)