Size: 2096
Comment:
|
Size: 2179
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 12: | Line 12: |
* Jig for the FC painting: Preparation for both sides. | |
Line 14: | Line 13: |
* Jig for FC painting: Application to both sides. | |
Line 24: | Line 24: |
* Modified three ACCs for ITMX. The capacitance sensors were replaced to the LVDTs. |
|
Line 55: | Line 57: |
(F2F Meeting in 12/17-18) |
|
Line 57: | Line 61: |
* Takahashi: 12/21-25 * Hirata: 12/21-25 * Yano: 12/21-25 (F2F Meeting in 12/17-18) |
* Takahashi: 12/21-24 * Hirata: 12/21-24 * Yano: 12/21-24 |
Agenda/Minutes on 2020/12/11
CRY+VIS Interface Meeting
13:30-
Participants:
- Schedule: The connection of ITMX after 1/12.
- Acceptance check items: Flow chart.
- Jig for FC painting: Application to both sides.
PF actuator: Measurement of coefficients --> calculation of the noise (by the end of Jan.).
VIS Meeting
14:00-
Participants:
Progress report
General
Type-A
- Modified three ACCs for ITMX. The capacitance sensors were replaced to the LVDTs.
Type-B
Type-Bp
Type-C
Controls
Electronics
Towards O4
- Type-B remedy work is on going.
- Modification of ACCs is on going.
- Schedule.
- Procedure documents.
- Criteria in the acceptance test.
Safety
Discussion
Travel Plans
The week from 12/14
- Takahashi: 12/14-18
- Hirata: 12/14-18
- Yano: 12/14-18
(F2F Meeting in 12/17-18)
The week from 12/21
- Takahashi: 12/21-24
- Hirata: 12/21-24
- Yano: 12/21-24
Next meeting
- On 2020/12/25(Fri)