Agenda/Minutes on 2020/12/11
CRY+VIS Interface Meeting
13:30-
Participants:
- Schedule: Connection of ITMX after 1/12.
- Acceptance check items: Flow chart.
- Jig for FC painting: Application to both sides.
PF actuator: Measurement of coefficients --> calculation of the noise (by the end of Jan.).
VIS Meeting
14:00-
Participants:
Progress report
General
Type-A
- Modified three ACCs for ITMX. The capacitance sensors were replaced to the LVDTs.
Type-B
Type-Bp
Type-C
Controls
Electronics
Towards O4
- Type-B remedy work is on going.
- Modification of ACCs is on going.
- Schedule.
- Procedure documents.
- Criteria in the acceptance test.
Safety
Discussion
Travel Plans
The week from 12/14
- Takahashi: 12/14-18
- Hirata: 12/14-18
- Yano: 12/14-18
(F2F Meeting in 12/17-18)
The week from 12/21
- Takahashi: 12/21-24
- Hirata: 12/21-24
- Yano: 12/21-24
Next meeting
- On 2020/12/25(Fri)