Agenda/Minutes on 2021/1/8
CRY+VIS Interface Meeting
13:30-13:55
Participants: Takahashi, Hirata, Sato, Yano, Aso, Miyo, Ushiba, Tomaru, Ikeda, Kimura, Hagiwara
- Schedule for IX: Connection of ITMX is scheduled in the week of 2/8.
- Schedule for IY: Cooling of payload is scheduled from 1/12.
- Corrugate tube fixing jig: Re-measurement in IYV is planed.
- Commissioning in vacuum:
- Acceptance check items:
- Jig for FC painting:
- PF actuator:
VIS Meeting
14:00-15:00
Participants: Takahashi, Tanaka, Fabian, Sato, Hirata, Aso, Miyo, Washimi
Progress report
General
Type-A
- Remedy work in IXV.
- Replaced three blades for TF.
- Mounted the ballast weight on the top plate of TF keystone.
- Assembled and tested the limit switches for the yaw and vertical FR.
- Assembled the geophones into the pods.
Type-B
Type-B
Albums
Week of the 4th of January
SR3
- In order to answer the question whether we should move the assembly frame next to SR3 as a back up plan,
- We opened SRM chamber -X door, next to where the frame is now and
- We measured the width of the clear space: 66 cm, which is enough.
- We should ask Mirapro to move the frame, but
- We need to move the rack with electronics and the cables and we need to allocate time to do it.
- The IP stepper motor shaft pitch was measured to be 1.0 mm/thread.
BS
- The IP stepper motor shaft pitch was measured to be 0.8 mm/thread.
- We received special screws, we installed the IP LVDTs and calibrated them: I have not checked the data but we might need to optimize the LVDT cards and repeat the calibration. I need to think about this issue more carefully.
- Before removing IP immobilizing jig we measured the output of the LVDTs in order to recover the aligned position.
- We replaced the heavy F0 top plate of the keystone assembly by a lighter one with ballast mass.
- We installed the F0 yaw stepper motor with limit switches. Test pending.
- We installed the F0 fishing rod limit switches. Test pending.
Type-B all
We checked the flanges we could use for the cables of a thermistor. See details in klog 15700.
Type-Bp
Type-C
Controls
Electronics
Towards O4
- Type-B remedy work is on going.
- Remedy work in IXV was started.
- Schedule.
- Procedure documents.
- Criteria in the acceptance test.
Safety
Discussion
Travel Plans
The week from 1/11
- Takahashi: ?
- Sato: ?
- Hirata: ?
- Yano: ?
Next meeting
- On 2020/1/15(Fri)