Agenda/Minutes on 2021/1/22
CRY+VIS Interface Meeting
13:30-
Participants:
- Schedule for IX: Connection of ITMX was rescheduled from 1/26.
- Schedule for IY: Cooling of payload was started from 1/18.
- Schedule for EX: Connection of ETMX was scheduled 3/15.
- Corrugate tube fixing jig: Re-measurement at the beginning of March (3/1-3) in IYV is planed.
- Commissioning in vacuum:
- Acceptance check items:
- Jig for FC painting: Under manufacturing.
- PF actuator: by the end of January.
VIS Meeting
14:00-
Participants:
Progress report
General
Type-A
Type-B
Type-Bp
Type-C
Controls
Electronics
Towards O4
- Type-B remedy work is on going.
- Installation of Type-A is on going in EY.
- Schedule.
- Procedure documents.
- Criteria in the acceptance test.
Safety
Discussion
- BS control noise
Travel Plans
The week from 1/25
- Takahashi: 1/25-29
- Sato: 1/25-29
- Hirata: 1/25-29
- Yano: 1/25-29
The week from 2/1
- Takahashi: 2/1-5
- Sato: 2/1-5
- Hirata: 2/1-5
- Yano: 2/1-5
Next meeting
- On 2020/1/29(Fri)