Agenda/Minutes on 2021/1/22

Zoom Meeting

CRY+VIS Interface Meeting

13:30-

Participants:

Post O3 Upgrade portal

  • Schedule for IX: Connection of ITMX was rescheduled from 1/26.
  • Schedule for IY: Cooling of payload was started from 1/18.
  • Schedule for EX: Connection of ETMX was scheduled 3/15.
  • Corrugate tube fixing jig: Re-measurement at the beginning of March (3/1-3) in IYV is planed.
  • Commissioning in vacuum:
  • Acceptance check items:
  • Jig for FC painting: Under manufacturing.
  • PF actuator: by the end of January.

VIS Meeting

14:00-

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

  • BS control noise

Travel Plans

The week from 1/25

  • Takahashi: 1/25-29
  • Sato: 1/25-29
  • Hirata: 1/25-29
  • Yano: 1/25-29

The week from 2/1

  • Takahashi: 2/1-5
  • Sato: 2/1-5
  • Hirata: 2/1-5
  • Yano: 2/1-5

Next meeting

  • On 2020/1/29(Fri)