  * Going to F3 stage.
  * Blades for FR in F3 was replaced. Checked the motion of FR.
  * Going to the F3 stage.
  * Blades for FR in the F3 was replaced. Checked the motion of FR.

Agenda/Minutes on 2021/1/22

Zoom Meeting

CRY+VIS Interface Meeting

13:30-

Participants:

Post O3 Upgrade portal

  • Schedule for IX: Connection of ITMX was rescheduled from 1/26.
  • Schedule for IY: Cooling of payload was started from 1/18.
  • Schedule for EX: Connection of ETMX was scheduled 3/15.
  • Corrugate tube fixing jig: Re-measurement at the beginning of March (3/1-3) in IYV is planed.
  • Commissioning in vacuum:
  • Acceptance check items:
  • Jig for FC painting: Under manufacturing.
  • PF actuator: by the end of January.

VIS Meeting

14:00-

Participants:

Progress report

General

Type-A

  • Installation in EYV.
    • Going to the F3 stage.
    • Blades for FR in the F3 was replaced. Checked the motion of FR.
    • Measured the spectrum of BF LVDT.
    • Mounted the F3 on the EQ stop. The BF was suspended by the F3.
    • Prepared the cables between the BF and F3.

Type-B

Albums

Week of the 18th of January

SRM

I disconnected SRM picomotor drivers to move them away from the assembly frame. I failed to report it in a klogin due time.

BS

  • Miyo-kun, Hirata-san and I reviewed the IP transformation matrices from IP LVDTs to L, T and Y and from actuation in L, T and Y to real coil-magnet actuator. We found a few of inconsistencies in existing documents. See klog reports 15769 and 15776.

  • We recovered the IP alignment:
    • See klog 15782.

    • I updated the medm screen with these matrices. Diagonalization is pending.
    • I moved the IP close to the setpoint using horizontal FRs.
    • I turned the control system on by hand and works fine. (I tried using Guardian but it keeps using the old setpoint values despite I took a snapshot.)
    • I moved BF keystone to around zero. (F1 keystone has been in midrange for a long time and we should not move it unless it's absolutely necessary.)
    • We went to the tunnel and recovered the oplev readout. We had to move the suspension in yaw by a lot (mrad maybe) using the new F0-Y stepper motor.
    • After recovery I measured TFs in the IP. They look fine, but in IP-L and IP-T the coherence is low from 150 mHz to 400 mHz. Terrence suggested to check coherence with ground motion and we cna also increase the amount of actuation.
  • We finally got to add ballast mass on top of BF:
    • When we began working the temperature was 23.1 degrees but when we finished it was 23.5 degrees (klog 15809), likely due to the coach filters (klog 15810), but this morning it was 23.0 degrees.

    • The final result is that the keystone is now about 16 um above the goal. It requires -1,100 counts of coil-magnet actuation to reach it. After pump down we can use the FR to move it closer if we think it's suitable.
    • The aligmment of the OSEMs didn't change much.
    • IM TF measuements reveal that the system is healthy.
  • Things left to do in BS suspension:
    • In F0 adjust ballast mass, FR position and limit switch positions.
    • Tune IP resonant frequency.
    • Measure IP-LVDT sensitivity.
    • Install oplev box (what is the status?)
    • Install outer frame large beam? (what is the status?)

Plan for next week

SR3

  • Alignment recovery after cabling (it seems they want to use it next week for injecting green light.)
  • Preparation for ballas mass adjustment.

Type-Bp

[Fabian] What's the plan for next week? It is something like this:

  • Traverser cable change?
  • Gluing wire in PR3?

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

  • BS control noise

Travel Plans

The week from 1/25

  • Takahashi: 1/25-29
  • Sato: 1/25-29
  • Hirata: 1/25-29
  • Yano: 1/25-29

The week from 2/1

  • Takahashi: 2/1-5
  • Sato: 2/1-5
  • Hirata: 2/1-5
  • Yano: 2/1-5

Next meeting

  • On 2020/1/29(Fri)