Describe KAGRA/Subgroups/VIS/VISMinutes20210205 here. | <<TableOfContents(3)>> = Agenda/Minutes on 2021/2/5 = [[https://zoom.us/j/203743987|Zoom Meeting]] == Activities in this week == * Sunday,[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15871|15871]]: VIS/General, '''kouseki.miyo''', ISOLATED state is available with only LVDTs not blended sensors. * Sunday,[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15870|15870]]: CAL/General, '''dan.chen''', YPcal noise investigation * Sunday,[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15869|15869]]: VIS/PR3, '''fabian.arellano''', Comment to Gluing the mirror wire. (Click here to view original report: 15844) * Sunday,[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15868|15868]]: VIS/General, '''kouseki.miyo''', Some suspensions are not SAFE. * Saturday,[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15867|15867]]: DGS/General, '''takahiro.yamamoto''', Security update for the gateway server * Friday,[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15866|15866]]: VIS/IX, '''ryutaro.takahashi''', Comment to Cabling for cryo-payload (Click here to view original report: 15860) * Friday,[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15865|15865]]: DGS/General, '''takahiro.yamamoto''', Installation of a new script server (k1script1) * Friday,[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15864|15864]]: VIS/IX, '''takafumi.ushiba''', Comment to Cabling for cryo-payload (Click here to view original report: 15860) * Friday,[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15863|15863]]: CAL/General, '''dan.chen''', Safety measures in EYA area * Friday,[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15862|15862]]: CAL/General, '''dan.chen''', New storage space for apparatus = CRY+VIS Interface Meeting = 13:30-14:00 Participants: [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Upgrades/PostO3Upgrades|Post O3 Upgrade portal]] Copy from previous meeting * Schedule for IX: Connection is scheduled in the week of 2/8. * Schedule for IY: Disconnection was scheduled on 3/11. * Schedule for EX: Connection was scheduled in the week of 3/15. * Corrugate tube fixing jig: Re-measurement is planed in 2/26-3/1 at IYV. * Commissioning in vacuum: Two phased commissioning will be tried in IX at beginning. After that, one phase is default. * Acceptance check: Cryo-payload in IX and Type-A tower in EY are on going. * Jig for FC painting: Under manufacturing. * PF actuator: by the end of January. = VIS Meeting = 14:00-16:00 Participants: == Progress report == === General === === Type-A === === Type-B === === Type-Bp === === Type-C === === Controls === === Electronics === == Towards O4 == * Type-B/Bp remedy work is on going. * Installation of Type-A is on going in EY. * Schedule. * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Chart]] * Procedure documents. * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5500|Type-A tower installation]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11598|Limit switches]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11520|Limit switch connecting guide]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11978|Replacement of TF blades]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11878|Wire gluing in PR3]] * [[https://onedrive.live.com/?authkey=!AOLVVVKJ_Zpn-2c&cid=1447B05D5B571A84&id=1447B05D5B571A84!26691&parId=1447B05D5B571A84!26683&o=OneUp|Type-B remedying work]] * Criteria in the acceptance test. * [[https://www.dropbox.com/s/6bv15yy6hg0wn40/Acceptance%20Test%20Documentation.docx?dl=0|Inspection document (sample)]] == Safety == == Discussion == == Travel Plans == == Next meeting == |
Contents
Agenda/Minutes on 2021/2/5
Activities in this week
Sunday,15871: VIS/General, kouseki.miyo, ISOLATED state is available with only LVDTs not blended sensors.
Sunday,15870: CAL/General, dan.chen, YPcal noise investigation
Sunday,15869: VIS/PR3, fabian.arellano, Comment to Gluing the mirror wire. (Click here to view original report: 15844)
Sunday,15868: VIS/General, kouseki.miyo, Some suspensions are not SAFE.
Saturday,15867: DGS/General, takahiro.yamamoto, Security update for the gateway server
Friday,15866: VIS/IX, ryutaro.takahashi, Comment to Cabling for cryo-payload (Click here to view original report: 15860)
Friday,15865: DGS/General, takahiro.yamamoto, Installation of a new script server (k1script1)
Friday,15864: VIS/IX, takafumi.ushiba, Comment to Cabling for cryo-payload (Click here to view original report: 15860)
Friday,15863: CAL/General, dan.chen, Safety measures in EYA area
Friday,15862: CAL/General, dan.chen, New storage space for apparatus
CRY+VIS Interface Meeting
13:30-14:00
Participants:
Copy from previous meeting
- Schedule for IX: Connection is scheduled in the week of 2/8.
- Schedule for IY: Disconnection was scheduled on 3/11.
- Schedule for EX: Connection was scheduled in the week of 3/15.
- Corrugate tube fixing jig: Re-measurement is planed in 2/26-3/1 at IYV.
- Commissioning in vacuum: Two phased commissioning will be tried in IX at beginning. After that, one phase is default.
- Acceptance check: Cryo-payload in IX and Type-A tower in EY are on going.
- Jig for FC painting: Under manufacturing.
- PF actuator: by the end of January.
VIS Meeting
14:00-16:00
Participants:
Progress report
General
Type-A
Type-B
Type-Bp
Type-C
Controls
Electronics
Towards O4
- Type-B/Bp remedy work is on going.
- Installation of Type-A is on going in EY.
- Schedule.
- Procedure documents.
- Criteria in the acceptance test.
Safety
Discussion