Describe KAGRA/Subgroups/VIS/VISMinutes20210205 here. | <<TableOfContents(3)>> = Activities in this week = '''Friday''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15864|15864]], Friday, '''takafumi.ushiba''', VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15866|15866]], Friday, '''ryutaro.takahashi''', VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860) '''Sunday''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15868|15868]], Sunday, '''kouseki.miyo''', VIS/General, Some suspensions are not SAFE. * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15869|15869]], Sunday, '''fabian.arellano''', VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15871|15871]], Sunday, '''kouseki.miyo''', VIS/General, ISOLATED state is available with only LVDTs not blended sensors. '''Monday''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15872|15872]], Monday, '''ryutaro.takahashi''', VIS/OMM, Comment to Modification of ACCs (Click here to view original report: 15617) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15873|15873]], Monday, '''kouseki.miyo''', VIS/General, Comment to Relay Switch of Stepper Motor Driver (Click here to view original report: 15847) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15875|15875]], Monday, '''fabian.arellano''', VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15876|15876]], Monday, '''satoru.ikeda''', VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15877|15877]], Monday, '''satoru.ikeda''', VIS/General, Comment to We investigated the network connection. (Click here to view original report: 15737) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15878|15878]], Monday, '''takafumi.ushiba''', CRY/Cryo-payload EX, EX payload upgrade '''Tuesday''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15880|15880]], Tuesday, '''satoru.ikeda''', VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15881|15881]], Tuesday, '''takaaki.yokozawa''', PEM/Center, IXC * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15882|15882]], Tuesday, '''satoru.ikeda''', VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15883|15883]], Tuesday, '''takayuki.tomaru''', CRY/Cryostat IY, IYC test (temperature & frosting) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15884|15884]], Tuesday, '''rishabh.bajpai''', CRY/Cryostat IY, Vibration Analysis * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15886|15886]], Tuesday, '''satoru.ikeda''', VIS/PR3, Driveable range of the PR3 GAS SF stepper motor * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15888|15888]], Tuesday, '''kouseki.miyo''', VIS/General, All payload models are in PAYLOAD_MASTER.mdl * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15885|15885]], Tuesday, '''fabian.arellano''', VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15889|15889]], Tuesday, '''fabian.arellano''', VIS/PR3, Traverser motor test and cabling. * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15890|15890]], Tuesday, '''satoru.ikeda''', VIS/PR3, Comment to Traverser motor test and cabling. (Click here to view original report: 15889) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15891|15891]], Tuesday, '''ryutaro.takahashi''', VIS/EY, Setup of F3 '''Wednesday''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15893|15893]], Wednesday, '''kouseki.miyo''', VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15894|15894]], Wednesday, '''kouseki.miyo''', VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15905|15905]], Wednesday, '''tatsuki.washimi''', PEM/General, Bird watching (Ondotori maintenance) 2021 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15906|15906]], Wednesday, '''kouseki.miyo''', VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15908|15908]], Wednesday, '''takafumi.ushiba''', CRY/Cryo-payload EX, Comment to EX payload upgrade (Click here to view original report: 15878) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15911|15911]], Wednesday, '''satoru.ikeda''', VIS/PR3, Comment to Traverser motor test and cabling. (Click here to view original report: 15889) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15910|15910]], Wednesday, '''kouseki.miyo''', VIS/EY, TF measurement for F3 GAS filter * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15912|15912]], Wednesday, '''kouseki.miyo''', VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15913|15913]], Wednesday, '''takayuki.tomaru''', CRY/Cryostat IY, IYC cooler no.3 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15918|15918]], Wednesday, '''ryutaro.takahashi''', VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15919|15919]], Wednesday, '''ryutaro.takahashi''', VIS/EY, Setup of BF * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15920|15920]], Wednesday, '''satoru.ikeda''', VIS/PR3, Comment to Traverser motor test and cabling. (Click here to view original report: 15889) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15921|15921]], Wednesday, '''fabian.arellano''', VIS/SR3, Oplev installation. This text is generated by script in "/kagra/Dropbox/Personal/miyo/Scripts/klog/main.py". = Agenda/Minutes on 2021/2/5 = [[https://zoom.us/j/203743987|Zoom Meeting]] = CRY+VIS Interface Meeting = 13:30- Participants: [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Upgrades/PostO3Upgrades|Post O3 Upgrade portal]] Copy from previous meeting * Schedule for IX: Connection is scheduled in the week of 2/8. * Schedule for IY: Disconnection is scheduled on 3/11. * Schedule for EX: Connection is scheduled in the week of 3/15. * Corrugate tube fixing jig: Re-measurement is planed in 2/26-3/1 at IYV. * Commissioning in vacuum: Two phased commissioning will be tried in IX at beginning. After that, one phase is default. * Acceptance check: Cryo-payload in IX and Type-A tower in EY are on going. * Jig for FC painting: Under manufacturing. * PF actuator: by the end of January. = VIS Meeting = 14:00- Participants: == Progress report == === General === === Type-A === === Type-B === === Type-Bp === === Type-C === === Controls === === Electronics === == Towards O4 == * Type-B/Bp remedy work is on going. * Installation of Type-A is on going in EY. * Schedule. * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Chart]] * Procedure documents. * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5500|Type-A tower installation]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11598|Limit switches]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11520|Limit switch connecting guide]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11978|Replacement of TF blades]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11878|Wire gluing in PR3]] * [[https://onedrive.live.com/?authkey=!AOLVVVKJ_Zpn-2c&cid=1447B05D5B571A84&id=1447B05D5B571A84!26691&parId=1447B05D5B571A84!26683&o=OneUp|Type-B remedying work]] * Criteria in the acceptance test. * [[https://www.dropbox.com/s/6bv15yy6hg0wn40/Acceptance%20Test%20Documentation.docx?dl=0|Inspection document (sample)]] == Safety == == Discussion == == Travel Plans == The week from 2/8 * Takahashi: 2/8-12 * Sato: 2/8-12 * Hirata: 2/8-12 * Yano: 2/8-12 The week from 2/15 * Takahashi: 2/15-19 * Sato: 2/15-19 * Hirata: 2/15-19 * Yano: 2/15-19 == Next meeting == * On 2020/2/12(Fri) |
Contents
Activities in this week
Friday
15864, Friday, takafumi.ushiba, VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860)
15866, Friday, ryutaro.takahashi, VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860)
Sunday
15868, Sunday, kouseki.miyo, VIS/General, Some suspensions are not SAFE.
15869, Sunday, fabian.arellano, VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844)
15871, Sunday, kouseki.miyo, VIS/General, ISOLATED state is available with only LVDTs not blended sensors.
Monday
15872, Monday, ryutaro.takahashi, VIS/OMM, Comment to Modification of ACCs (Click here to view original report: 15617)
15873, Monday, kouseki.miyo, VIS/General, Comment to Relay Switch of Stepper Motor Driver (Click here to view original report: 15847)
15875, Monday, fabian.arellano, VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844)
15876, Monday, satoru.ikeda, VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857)
15877, Monday, satoru.ikeda, VIS/General, Comment to We investigated the network connection. (Click here to view original report: 15737)
15878, Monday, takafumi.ushiba, CRY/Cryo-payload EX, EX payload upgrade
Tuesday
15880, Tuesday, satoru.ikeda, VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857)
15881, Tuesday, takaaki.yokozawa, PEM/Center, IXC
15882, Tuesday, satoru.ikeda, VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857)
15883, Tuesday, takayuki.tomaru, CRY/Cryostat IY, IYC test (temperature & frosting)
15884, Tuesday, rishabh.bajpai, CRY/Cryostat IY, Vibration Analysis
15886, Tuesday, satoru.ikeda, VIS/PR3, Driveable range of the PR3 GAS SF stepper motor
15888, Tuesday, kouseki.miyo, VIS/General, All payload models are in PAYLOAD_MASTER.mdl
15885, Tuesday, fabian.arellano, VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844)
15889, Tuesday, fabian.arellano, VIS/PR3, Traverser motor test and cabling.
15890, Tuesday, satoru.ikeda, VIS/PR3, Comment to Traverser motor test and cabling. (Click here to view original report: 15889)
15891, Tuesday, ryutaro.takahashi, VIS/EY, Setup of F3
Wednesday
15893, Wednesday, kouseki.miyo, VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891)
15894, Wednesday, kouseki.miyo, VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891)
15905, Wednesday, tatsuki.washimi, PEM/General, Bird watching (Ondotori maintenance) 2021
15906, Wednesday, kouseki.miyo, VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891)
15908, Wednesday, takafumi.ushiba, CRY/Cryo-payload EX, Comment to EX payload upgrade (Click here to view original report: 15878)
15911, Wednesday, satoru.ikeda, VIS/PR3, Comment to Traverser motor test and cabling. (Click here to view original report: 15889)
15910, Wednesday, kouseki.miyo, VIS/EY, TF measurement for F3 GAS filter
15912, Wednesday, kouseki.miyo, VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891)
15913, Wednesday, takayuki.tomaru, CRY/Cryostat IY, IYC cooler no.3
15918, Wednesday, ryutaro.takahashi, VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891)
15919, Wednesday, ryutaro.takahashi, VIS/EY, Setup of BF
15920, Wednesday, satoru.ikeda, VIS/PR3, Comment to Traverser motor test and cabling. (Click here to view original report: 15889)
15921, Wednesday, fabian.arellano, VIS/SR3, Oplev installation.
This text is generated by script in "/kagra/Dropbox/Personal/miyo/Scripts/klog/main.py".
Agenda/Minutes on 2021/2/5
CRY+VIS Interface Meeting
13:30-
Participants:
Copy from previous meeting
- Schedule for IX: Connection is scheduled in the week of 2/8.
- Schedule for IY: Disconnection is scheduled on 3/11.
- Schedule for EX: Connection is scheduled in the week of 3/15.
- Corrugate tube fixing jig: Re-measurement is planed in 2/26-3/1 at IYV.
- Commissioning in vacuum: Two phased commissioning will be tried in IX at beginning. After that, one phase is default.
- Acceptance check: Cryo-payload in IX and Type-A tower in EY are on going.
- Jig for FC painting: Under manufacturing.
- PF actuator: by the end of January.
VIS Meeting
14:00-
Participants:
Progress report
General
Type-A
Type-B
Type-Bp
Type-C
Controls
Electronics
Towards O4
- Type-B/Bp remedy work is on going.
- Installation of Type-A is on going in EY.
- Schedule.
- Procedure documents.
- Criteria in the acceptance test.
Safety
Discussion
Travel Plans
The week from 2/8
- Takahashi: 2/8-12
- Sato: 2/8-12
- Hirata: 2/8-12
- Yano: 2/8-12
The week from 2/15
- Takahashi: 2/15-19
- Sato: 2/15-19
- Hirata: 2/15-19
- Yano: 2/15-19
Next meeting
- On 2020/2/12(Fri)