Describe KAGRA/Subgroups/VIS/VISMinutes20210205 here. <<TableOfContents(3)>>
= Activities in this week =
'''Friday'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15864|15864]], Friday, '''takafumi.ushiba''', VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860)
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15866|15866]], Friday, '''ryutaro.takahashi''', VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860)
'''Sunday'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15868|15868]], Sunday, '''kouseki.miyo''', VIS/General, Some suspensions are not SAFE.
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15869|15869]], Sunday, '''fabian.arellano''', VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844)
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15871|15871]], Sunday, '''kouseki.miyo''', VIS/General, ISOLATED state is available with only LVDTs not blended sensors.
'''Monday'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15872|15872]], Monday, '''ryutaro.takahashi''', VIS/OMM, Comment to Modification of ACCs (Click here to view original report: 15617)
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15873|15873]], Monday, '''kouseki.miyo''', VIS/General, Comment to Relay Switch of Stepper Motor Driver (Click here to view original report: 15847)
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15875|15875]], Monday, '''fabian.arellano''', VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844)
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15876|15876]], Monday, '''satoru.ikeda''', VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857)
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15877|15877]], Monday, '''satoru.ikeda''', VIS/General, Comment to We investigated the network connection. (Click here to view original report: 15737)
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15878|15878]], Monday, '''takafumi.ushiba''', CRY/Cryo-payload EX, EX payload upgrade
'''Tuesday'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15880|15880]], Tuesday, '''satoru.ikeda''', VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857)
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15881|15881]], Tuesday, '''takaaki.yokozawa''', PEM/Center, IXC
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15882|15882]], Tuesday, '''satoru.ikeda''', VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857)
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15883|15883]], Tuesday, '''takayuki.tomaru''', CRY/Cryostat IY, IYC test (temperature & frosting)
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15884|15884]], Tuesday, '''rishabh.bajpai''', CRY/Cryostat IY, Vibration Analysis
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15886|15886]], Tuesday, '''satoru.ikeda''', VIS/PR3, Driveable range of the PR3 GAS SF stepper motor
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15888|15888]], Tuesday, '''kouseki.miyo''', VIS/General, All payload models are in PAYLOAD_MASTER.mdl
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15885|15885]], Tuesday, '''fabian.arellano''', VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844)
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15889|15889]], Tuesday, '''fabian.arellano''', VIS/PR3, Traverser motor test and cabling.
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15890|15890]], Tuesday, '''satoru.ikeda''', VIS/PR3, Comment to Traverser motor test and cabling. (Click here to view original report: 15889)
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15891|15891]], Tuesday, '''ryutaro.takahashi''', VIS/EY, Setup of F3
'''Wednesday'''
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15893|15893]], Wednesday, '''kouseki.miyo''', VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891)
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15894|15894]], Wednesday, '''kouseki.miyo''', VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891)
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15905|15905]], Wednesday, '''tatsuki.washimi''', PEM/General, Bird watching (Ondotori maintenance) 2021
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15906|15906]], Wednesday, '''kouseki.miyo''', VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891)
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15908|15908]], Wednesday, '''takafumi.ushiba''', CRY/Cryo-payload EX, Comment to EX payload upgrade (Click here to view original report: 15878)
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15911|15911]], Wednesday, '''satoru.ikeda''', VIS/PR3, Comment to Traverser motor test and cabling. (Click here to view original report: 15889)
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15910|15910]], Wednesday, '''kouseki.miyo''', VIS/EY, TF measurement for F3 GAS filter
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15912|15912]], Wednesday, '''kouseki.miyo''', VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891)
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15913|15913]], Wednesday, '''takayuki.tomaru''', CRY/Cryostat IY, IYC cooler no.3
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15918|15918]], Wednesday, '''ryutaro.takahashi''', VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891)
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15919|15919]], Wednesday, '''ryutaro.takahashi''', VIS/EY, Setup of BF
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15920|15920]], Wednesday, '''satoru.ikeda''', VIS/PR3, Comment to Traverser motor test and cabling. (Click here to view original report: 15889)
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15921|15921]], Wednesday, '''fabian.arellano''', VIS/SR3, Oplev installation.
This text is generated by script in "/kagra/Dropbox/Personal/miyo/Scripts/klog/main.py".

= Agenda/Minutes on 2021/2/5 =
[[https://zoom.us/j/203743987|Zoom Meeting]]

= CRY+VIS Interface Meeting =
13:30-

Participants:

[[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Upgrades/PostO3Upgrades|Post O3 Upgrade portal]]

Copy from previous meeting
 * Schedule for IX: Connection is scheduled in the week of 2/8.
 * Schedule for IY: Disconnection is scheduled on 3/11.
 * Schedule for EX: Connection is scheduled in the week of 3/15.
 * Corrugate tube fixing jig: Re-measurement is planed in 2/26-3/1 at IYV.
 * Commissioning in vacuum: Two phased commissioning will be tried in IX at beginning. After that, one phase is default.
 * Acceptance check: Cryo-payload in IX and Type-A tower in EY are on going.
 * Jig for FC painting: Under manufacturing.
 * PF actuator: by the end of January.
 
= VIS Meeting =
14:00-

Participants:

== Progress report ==
=== General ===
=== Type-A ===
=== Type-B ===
=== Type-Bp ===
=== Type-C ===
=== Controls ===
=== Electronics ===

== Towards O4 ==
 * Type-B/Bp remedy work is on going.
 * Installation of Type-A is on going in EY.
 * Schedule.
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Chart]]
 * Procedure documents.
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5500|Type-A tower installation]]
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11598|Limit switches]]
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11520|Limit switch connecting guide]]
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11978|Replacement of TF blades]]
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11878|Wire gluing in PR3]]
  * [[https://onedrive.live.com/?authkey=!AOLVVVKJ_Zpn-2c&cid=1447B05D5B571A84&id=1447B05D5B571A84!26691&parId=1447B05D5B571A84!26683&o=OneUp|Type-B remedying work]]
 * Criteria in the acceptance test.
  * [[https://www.dropbox.com/s/6bv15yy6hg0wn40/Acceptance%20Test%20Documentation.docx?dl=0|Inspection document (sample)]]

== Safety ==
== Discussion ==
== Travel Plans ==
The week from 2/8

 * Takahashi: 2/8-12
 * Sato: 2/8-12
 * Hirata: 2/8-12
 * Yano: 2/8-12

The week from 2/15

 * Takahashi: 2/15-19
 * Sato: 2/15-19
 * Hirata: 2/15-19
 * Yano: 2/15-19

== Next meeting ==
 * On 2020/2/12(Fri)

Activities in this week

Friday

  • 15864, Friday, takafumi.ushiba, VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860)

  • 15866, Friday, ryutaro.takahashi, VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860)

Sunday

  • 15868, Sunday, kouseki.miyo, VIS/General, Some suspensions are not SAFE.

  • 15869, Sunday, fabian.arellano, VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844)

  • 15871, Sunday, kouseki.miyo, VIS/General, ISOLATED state is available with only LVDTs not blended sensors.

Monday

  • 15872, Monday, ryutaro.takahashi, VIS/OMM, Comment to Modification of ACCs (Click here to view original report: 15617)

  • 15873, Monday, kouseki.miyo, VIS/General, Comment to Relay Switch of Stepper Motor Driver (Click here to view original report: 15847)

  • 15875, Monday, fabian.arellano, VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844)

  • 15876, Monday, satoru.ikeda, VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857)

  • 15877, Monday, satoru.ikeda, VIS/General, Comment to We investigated the network connection. (Click here to view original report: 15737)

  • 15878, Monday, takafumi.ushiba, CRY/Cryo-payload EX, EX payload upgrade

Tuesday

  • 15880, Tuesday, satoru.ikeda, VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857)

  • 15881, Tuesday, takaaki.yokozawa, PEM/Center, IXC

  • 15882, Tuesday, satoru.ikeda, VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857)

  • 15883, Tuesday, takayuki.tomaru, CRY/Cryostat IY, IYC test (temperature & frosting)

  • 15884, Tuesday, rishabh.bajpai, CRY/Cryostat IY, Vibration Analysis

  • 15886, Tuesday, satoru.ikeda, VIS/PR3, Driveable range of the PR3 GAS SF stepper motor

  • 15888, Tuesday, kouseki.miyo, VIS/General, All payload models are in PAYLOAD_MASTER.mdl

  • 15885, Tuesday, fabian.arellano, VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844)

  • 15889, Tuesday, fabian.arellano, VIS/PR3, Traverser motor test and cabling.

  • 15890, Tuesday, satoru.ikeda, VIS/PR3, Comment to Traverser motor test and cabling. (Click here to view original report: 15889)

  • 15891, Tuesday, ryutaro.takahashi, VIS/EY, Setup of F3

Wednesday

  • 15893, Wednesday, kouseki.miyo, VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891)

  • 15894, Wednesday, kouseki.miyo, VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891)

  • 15905, Wednesday, tatsuki.washimi, PEM/General, Bird watching (Ondotori maintenance) 2021

  • 15906, Wednesday, kouseki.miyo, VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891)

  • 15908, Wednesday, takafumi.ushiba, CRY/Cryo-payload EX, Comment to EX payload upgrade (Click here to view original report: 15878)

  • 15911, Wednesday, satoru.ikeda, VIS/PR3, Comment to Traverser motor test and cabling. (Click here to view original report: 15889)

  • 15910, Wednesday, kouseki.miyo, VIS/EY, TF measurement for F3 GAS filter

  • 15912, Wednesday, kouseki.miyo, VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891)

  • 15913, Wednesday, takayuki.tomaru, CRY/Cryostat IY, IYC cooler no.3

  • 15918, Wednesday, ryutaro.takahashi, VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891)

  • 15919, Wednesday, ryutaro.takahashi, VIS/EY, Setup of BF

  • 15920, Wednesday, satoru.ikeda, VIS/PR3, Comment to Traverser motor test and cabling. (Click here to view original report: 15889)

  • 15921, Wednesday, fabian.arellano, VIS/SR3, Oplev installation.

This text is generated by script in "/kagra/Dropbox/Personal/miyo/Scripts/klog/main.py".

Agenda/Minutes on 2021/2/5

Zoom Meeting

CRY+VIS Interface Meeting

13:30-

Participants:

Post O3 Upgrade portal

Copy from previous meeting

  • Schedule for IX: Connection is scheduled in the week of 2/8.
  • Schedule for IY: Disconnection is scheduled on 3/11.
  • Schedule for EX: Connection is scheduled in the week of 3/15.
  • Corrugate tube fixing jig: Re-measurement is planed in 2/26-3/1 at IYV.
  • Commissioning in vacuum: Two phased commissioning will be tried in IX at beginning. After that, one phase is default.
  • Acceptance check: Cryo-payload in IX and Type-A tower in EY are on going.
  • Jig for FC painting: Under manufacturing.
  • PF actuator: by the end of January.

VIS Meeting

14:00-

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 2/8

  • Takahashi: 2/8-12
  • Sato: 2/8-12
  • Hirata: 2/8-12
  • Yano: 2/8-12

The week from 2/15

  • Takahashi: 2/15-19
  • Sato: 2/15-19
  • Hirata: 2/15-19
  • Yano: 2/15-19

Next meeting

  • On 2020/2/12(Fri)