Describe KAGRA/Subgroups/VIS/VISMinutes20210205 here. | <<TableOfContents(3)>> = Activities in this week = '''Friday''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15864|15864]], VIS/IX, '''takafumi.ushiba''', Comment to Cabling for cryo-payload (Click here to view original report: 15860) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15866|15866]], VIS/IX, '''ryutaro.takahashi''', Comment to Cabling for cryo-payload (Click here to view original report: 15860) '''Sunday''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15868|15868]], VIS/General, '''kouseki.miyo''', Some suspensions are not SAFE. * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15869|15869]], VIS/PR3, '''fabian.arellano''', Comment to Gluing the mirror wire. (Click here to view original report: 15844) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15871|15871]], VIS/General, '''kouseki.miyo''', ISOLATED state is available with only LVDTs not blended sensors. '''Monday''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15872|15872]], VIS/OMM, '''ryutaro.takahashi''', Comment to Modification of ACCs (Click here to view original report: 15617) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15873|15873]], VIS/General, '''kouseki.miyo''', Comment to Relay Switch of Stepper Motor Driver (Click here to view original report: 15847) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15875|15875]], VIS/PR3, '''fabian.arellano''', Comment to Gluing the mirror wire. (Click here to view original report: 15844) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15876|15876]], VIS/PR2, '''satoru.ikeda''', Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15877|15877]], VIS/General, '''satoru.ikeda''', Comment to We investigated the network connection. (Click here to view original report: 15737) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15878|15878]], CRY/Cryo-payload EX, '''takafumi.ushiba''', EX payload upgrade '''Tuesday''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15880|15880]], VIS/PR2, '''satoru.ikeda''', Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15881|15881]], PEM/Center, '''takaaki.yokozawa''', IXC * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15882|15882]], VIS/PR2, '''satoru.ikeda''', Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15883|15883]], CRY/Cryostat IY, '''takayuki.tomaru''', IYC test (temperature & frosting) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15884|15884]], CRY/Cryostat IY, '''rishabh.bajpai''', Vibration Analysis * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15886|15886]], VIS/PR3, '''satoru.ikeda''', Driveable range of the PR3 GAS SF stepper motor * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15888|15888]], VIS/General, '''kouseki.miyo''', All payload models are in PAYLOAD_MASTER.mdl * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15885|15885]], VIS/PR3, '''fabian.arellano''', Comment to Gluing the mirror wire. (Click here to view original report: 15844) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15889|15889]], VIS/PR3, '''fabian.arellano''', Traverser motor test and cabling. * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15890|15890]], VIS/PR3, '''satoru.ikeda''', Comment to Traverser motor test and cabling. (Click here to view original report: 15889) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15891|15891]], VIS/EY, '''ryutaro.takahashi''', Setup of F3 '''Wednesday''' * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15893|15893]], VIS/EY, '''kouseki.miyo''', Comment to Setup of F3 (Click here to view original report: 15891) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15894|15894]], VIS/EY, '''kouseki.miyo''', Comment to Setup of F3 (Click here to view original report: 15891) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15905|15905]], PEM/General, '''tatsuki.washimi''', Bird watching (Ondotori maintenance) 2021 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15906|15906]], VIS/EY, '''kouseki.miyo''', Comment to Setup of F3 (Click here to view original report: 15891) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15908|15908]], CRY/Cryo-payload EX, '''takafumi.ushiba''', Comment to EX payload upgrade (Click here to view original report: 15878) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15911|15911]], VIS/PR3, '''satoru.ikeda''', Comment to Traverser motor test and cabling. (Click here to view original report: 15889) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15910|15910]], VIS/EY, '''kouseki.miyo''', TF measurement for F3 GAS filter * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15912|15912]], VIS/EY, '''kouseki.miyo''', Comment to Setup of F3 (Click here to view original report: 15891) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15913|15913]], CRY/Cryostat IY, '''takayuki.tomaru''', IYC cooler no.3 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15916|15916]], IOO/IMC, '''tomotada.akutsu''', Pre-inspection of the suspension structures for MCi * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15917|15917]], IOO/IMC, '''tomotada.akutsu''', Turned off the power supply to the tilt-sensor laser * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15918|15918]], VIS/EY, '''ryutaro.takahashi''', Comment to Setup of F3 (Click here to view original report: 15891) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15919|15919]], VIS/EY, '''ryutaro.takahashi''', Setup of BF * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15920|15920]], VIS/PR3, '''satoru.ikeda''', Comment to Traverser motor test and cabling. (Click here to view original report: 15889) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15921|15921]], VIS/SR3, '''fabian.arellano''', Oplev installation. = Agenda/Minutes on 2021/2/5 = [[https://zoom.us/j/203743987|Zoom Meeting]] = CRY+VIS Interface Meeting = 13:30- Participants: [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Upgrades/PostO3Upgrades|Post O3 Upgrade portal]] Copy from previous meeting * Schedule for IX: Connection is scheduled in the week of 2/8. Do you work on 2/11? * Schedule for IY: Disconnection is scheduled on 3/11. * Schedule for EX: Connection is scheduled in the week of 3/15. * Corrugate tube fixing jig: Re-measurement is planed in 2/26-3/1 at IYV. * Commissioning in vacuum: Two phased commissioning will be tried in IX at beginning. After that, one phase is default. * Acceptance check: Cryo-payload in IX and Type-A tower in EY are on going. * Jig for FC painting: Under manufacturing. * PF actuator: by the end of January. = VIS Meeting = 14:00- Participants: == Progress report == === General === === Type-A === * Finished assembly of the ACCs and the geophone pods in IX. * Setup the F3: Calibration of the LVDT, Measurement of the FR range, Tuning of filter, Measurement of the TFs, Cabling around the F3. * Lifted down the EQ stop into the corrugate tube. The F3 stage sit down the frame lock. === Type-B === === Type-Bp === === Type-C === * Remedy of cabling for the actuator coils in the IMC suspensions is required. === Controls === === Electronics === == Towards O4 == * Type-B/Bp remedy work is on going. * Installation of Type-A is on going in EY. * Schedule. * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11475|Chart]] * Procedure documents. * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5500|Type-A tower installation]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11598|Limit switches]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11520|Limit switch connecting guide]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11978|Replacement of TF blades]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11878|Wire gluing in PR3]] * [[https://onedrive.live.com/?authkey=!AOLVVVKJ_Zpn-2c&cid=1447B05D5B571A84&id=1447B05D5B571A84!26691&parId=1447B05D5B571A84!26683&o=OneUp|Type-B remedying work]] * Criteria in the acceptance test. * [[https://www.dropbox.com/s/6bv15yy6hg0wn40/Acceptance%20Test%20Documentation.docx?dl=0|Inspection document (sample)]] == Safety == == Discussion == == Travel Plans == The week from 2/8 * Takahashi: 2/8-12 * Sato: 2/8-12 * Hirata: 2/8-12 * Yano: 2/8-12 The week from 2/15 * Takahashi: 2/15-19 * Sato: 2/15-19 * Hirata: 2/15-19 * Yano: 2/15-19 == Next meeting == * On 2020/2/12(Fri) |
Contents
Activities in this week
Friday
15864, VIS/IX, takafumi.ushiba, Comment to Cabling for cryo-payload (Click here to view original report: 15860)
15866, VIS/IX, ryutaro.takahashi, Comment to Cabling for cryo-payload (Click here to view original report: 15860)
Sunday
15868, VIS/General, kouseki.miyo, Some suspensions are not SAFE.
15869, VIS/PR3, fabian.arellano, Comment to Gluing the mirror wire. (Click here to view original report: 15844)
15871, VIS/General, kouseki.miyo, ISOLATED state is available with only LVDTs not blended sensors.
Monday
15872, VIS/OMM, ryutaro.takahashi, Comment to Modification of ACCs (Click here to view original report: 15617)
15873, VIS/General, kouseki.miyo, Comment to Relay Switch of Stepper Motor Driver (Click here to view original report: 15847)
15875, VIS/PR3, fabian.arellano, Comment to Gluing the mirror wire. (Click here to view original report: 15844)
15876, VIS/PR2, satoru.ikeda, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857)
15877, VIS/General, satoru.ikeda, Comment to We investigated the network connection. (Click here to view original report: 15737)
15878, CRY/Cryo-payload EX, takafumi.ushiba, EX payload upgrade
Tuesday
15880, VIS/PR2, satoru.ikeda, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857)
15881, PEM/Center, takaaki.yokozawa, IXC
15882, VIS/PR2, satoru.ikeda, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857)
15883, CRY/Cryostat IY, takayuki.tomaru, IYC test (temperature & frosting)
15884, CRY/Cryostat IY, rishabh.bajpai, Vibration Analysis
15886, VIS/PR3, satoru.ikeda, Driveable range of the PR3 GAS SF stepper motor
15888, VIS/General, kouseki.miyo, All payload models are in PAYLOAD_MASTER.mdl
15885, VIS/PR3, fabian.arellano, Comment to Gluing the mirror wire. (Click here to view original report: 15844)
15889, VIS/PR3, fabian.arellano, Traverser motor test and cabling.
15890, VIS/PR3, satoru.ikeda, Comment to Traverser motor test and cabling. (Click here to view original report: 15889)
15891, VIS/EY, ryutaro.takahashi, Setup of F3
Wednesday
15893, VIS/EY, kouseki.miyo, Comment to Setup of F3 (Click here to view original report: 15891)
15894, VIS/EY, kouseki.miyo, Comment to Setup of F3 (Click here to view original report: 15891)
15905, PEM/General, tatsuki.washimi, Bird watching (Ondotori maintenance) 2021
15906, VIS/EY, kouseki.miyo, Comment to Setup of F3 (Click here to view original report: 15891)
15908, CRY/Cryo-payload EX, takafumi.ushiba, Comment to EX payload upgrade (Click here to view original report: 15878)
15911, VIS/PR3, satoru.ikeda, Comment to Traverser motor test and cabling. (Click here to view original report: 15889)
15910, VIS/EY, kouseki.miyo, TF measurement for F3 GAS filter
15912, VIS/EY, kouseki.miyo, Comment to Setup of F3 (Click here to view original report: 15891)
15913, CRY/Cryostat IY, takayuki.tomaru, IYC cooler no.3
15916, IOO/IMC, tomotada.akutsu, Pre-inspection of the suspension structures for MCi
15917, IOO/IMC, tomotada.akutsu, Turned off the power supply to the tilt-sensor laser
15918, VIS/EY, ryutaro.takahashi, Comment to Setup of F3 (Click here to view original report: 15891)
15919, VIS/EY, ryutaro.takahashi, Setup of BF
15920, VIS/PR3, satoru.ikeda, Comment to Traverser motor test and cabling. (Click here to view original report: 15889)
15921, VIS/SR3, fabian.arellano, Oplev installation.
Agenda/Minutes on 2021/2/5
CRY+VIS Interface Meeting
13:30-
Participants:
Copy from previous meeting
- Schedule for IX: Connection is scheduled in the week of 2/8. Do you work on 2/11?
- Schedule for IY: Disconnection is scheduled on 3/11.
- Schedule for EX: Connection is scheduled in the week of 3/15.
- Corrugate tube fixing jig: Re-measurement is planed in 2/26-3/1 at IYV.
- Commissioning in vacuum: Two phased commissioning will be tried in IX at beginning. After that, one phase is default.
- Acceptance check: Cryo-payload in IX and Type-A tower in EY are on going.
- Jig for FC painting: Under manufacturing.
- PF actuator: by the end of January.
VIS Meeting
14:00-
Participants:
Progress report
General
Type-A
- Finished assembly of the ACCs and the geophone pods in IX.
- Setup the F3: Calibration of the LVDT, Measurement of the FR range, Tuning of filter, Measurement of the TFs, Cabling around the F3.
- Lifted down the EQ stop into the corrugate tube. The F3 stage sit down the frame lock.
Type-B
Type-Bp
Type-C
- Remedy of cabling for the actuator coils in the IMC suspensions is required.
Controls
Electronics
Towards O4
- Type-B/Bp remedy work is on going.
- Installation of Type-A is on going in EY.
- Schedule.
- Procedure documents.
- Criteria in the acceptance test.
Safety
Discussion
Travel Plans
The week from 2/8
- Takahashi: 2/8-12
- Sato: 2/8-12
- Hirata: 2/8-12
- Yano: 2/8-12
The week from 2/15
- Takahashi: 2/15-19
- Sato: 2/15-19
- Hirata: 2/15-19
- Yano: 2/15-19