Differences between revisions 16 and 17
Revision 16 as of 2021-02-01 08:40:34
Size: 3107
Editor: KousekiMiyo
Comment:
Revision 17 as of 2021-02-01 08:45:14
Size: 3112
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
 * Friday,[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15864|15864]]: VIS/IX, '''takafumi.ushiba''', Comment to Cabling for cryo-payload (Click here to view original report: 15860)
 * Friday,[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15866|15866]]: VIS/IX, '''ryutaro.takahashi''', Comment to Cabling for cryo-payload (Click here to view original report: 15860)
 * Sunday,[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15868|15868]]: VIS/General, '''kouseki.miyo''', Some suspensions are not SAFE.
 * Sunday,[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15869|15869]]: VIS/PR3, '''fabian.arellano''', Comment to Gluing the mirror wire. (Click here to view original report: 15844)
 * Sunday,[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15871|15871]]: VIS/General, '''kouseki.miyo''', ISOLATED state is available with only LVDTs not blended sensors.
 * '''takafumi.ushiba''', Friday, VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15864|15864]]
 * '''ryutaro.takahashi''', Friday, VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15866|15866]]
 * '''kouseki.miyo''', Sunday, VIS/General, Some suspensions are not SAFE., [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15868|15868]]
 * '''fabian.arellano''', Sunday, VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15869|15869]]
 * '''kouseki.miyo''', Sunday, VIS/General, ISOLATED state is available with only LVDTs not blended sensors., [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15871|15871]]

Activities in this week

  • takafumi.ushiba, Friday, VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860), 15864

  • ryutaro.takahashi, Friday, VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860), 15866

  • kouseki.miyo, Sunday, VIS/General, Some suspensions are not SAFE., 15868

  • fabian.arellano, Sunday, VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844), 15869

  • kouseki.miyo, Sunday, VIS/General, ISOLATED state is available with only LVDTs not blended sensors., 15871

Agenda/Minutes on 2021/2/5

Zoom Meeting

CRY+VIS Interface Meeting

13:30-14:00

Participants:

Post O3 Upgrade portal

Copy from previous meeting

  • Schedule for IX: Connection is scheduled in the week of 2/8.
  • Schedule for IY: Disconnection was scheduled on 3/11.
  • Schedule for EX: Connection was scheduled in the week of 3/15.
  • Corrugate tube fixing jig: Re-measurement is planed in 2/26-3/1 at IYV.
  • Commissioning in vacuum: Two phased commissioning will be tried in IX at beginning. After that, one phase is default.
  • Acceptance check: Cryo-payload in IX and Type-A tower in EY are on going.
  • Jig for FC painting: Under manufacturing.
  • PF actuator: by the end of January.

VIS Meeting

14:00-16:00

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

Next meeting

KAGRA/Subgroups/VIS/VISMinutes20210205 (last edited 2021-02-11 21:23:44 by RyutaroTakahashi)