Copy from previous meeting

Agenda/Minutes on 2021/2/5

Zoom Meeting

CRY+VIS Interface Meeting

13:30-14:00

Participants:

Post O3 Upgrade portal

Copy from previous meeting

  • Schedule for IX: Connection is scheduled in the week of 2/8.
  • Schedule for IY: Disconnection was scheduled on 3/11.
  • Schedule for EX: Connection was scheduled in the week of 3/15.
  • Corrugate tube fixing jig: Re-measurement is planed in 2/26-3/1 at IYV.
  • Commissioning in vacuum: Two phased commissioning will be tried in IX at beginning. After that, one phase is default.
  • Acceptance check: Cryo-payload in IX and Type-A tower in EY are on going.
  • Jig for FC painting: Under manufacturing.
  • PF actuator: by the end of January.
    • [Miyo] Although this project must start after we define the actuator efficiency of PF, I (Miyo) have not defined yet. Progress is here.

VIS Meeting

14:00-16:00

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

Next meeting