Differences between revisions 23 and 24
Revision 23 as of 2021-02-03 07:48:20
Size: 5986
Editor: KousekiMiyo
Comment:
Revision 24 as of 2021-02-03 08:45:02
Size: 5993
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 29: Line 29:
This text is generated by script in "/kagra/Dropbox/Personal/miyo/Scripts/klog/main.py". This text is generated by python script in "/kagra/Dropbox/Personal/miyo/Scripts/klog/main.py".

Activities in this week

Friday

  • Friday, takafumi.ushiba, VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860), 15864

  • Friday, ryutaro.takahashi, VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860), 15866

Sunday

  • Sunday, kouseki.miyo, VIS/General, Some suspensions are not SAFE., 15868

  • Sunday, fabian.arellano, VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844), 15869

  • Sunday, kouseki.miyo, VIS/General, ISOLATED state is available with only LVDTs not blended sensors., 15871

Monday

  • Monday, ryutaro.takahashi, VIS/OMM, Comment to Modification of ACCs (Click here to view original report: 15617), 15872

  • Monday, kouseki.miyo, VIS/General, Comment to Relay Switch of Stepper Motor Driver (Click here to view original report: 15847), 15873

  • Monday, fabian.arellano, VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844), 15875

  • Monday, satoru.ikeda, VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857), 15876

  • Monday, satoru.ikeda, VIS/General, Comment to We investigated the network connection. (Click here to view original report: 15737), 15877

  • Monday, takafumi.ushiba, CRY/Cryo-payload EX, EX payload upgrade, 15878

Tuesday

  • Tuesday, satoru.ikeda, VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857), 15880

  • Tuesday, takaaki.yokozawa, PEM/Center, IXC, 15881

  • Tuesday, satoru.ikeda, VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857), 15882

  • Tuesday, takayuki.tomaru, CRY/Cryostat IY, IYC test (temperature & frosting), 15883

  • Tuesday, rishabh.bajpai, CRY/Cryostat IY, Vibration Analysis, 15884

  • Tuesday, satoru.ikeda, VIS/PR3, Driveable range of the PR3 GAS SF stepper motor, 15886

  • Tuesday, kouseki.miyo, VIS/General, All payload models are in PAYLOAD_MASTER.mdl, 15888

  • Tuesday, fabian.arellano, VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844), 15885

  • Tuesday, fabian.arellano, VIS/PR3, Traverser motor test and cabling., 15889

  • Tuesday, satoru.ikeda, VIS/PR3, Comment to Traverser motor test and cabling. (Click here to view original report: 15889), 15890

  • Tuesday, ryutaro.takahashi, VIS/EY, Setup of F3, 15891

This text is generated by python script in "/kagra/Dropbox/Personal/miyo/Scripts/klog/main.py".

Agenda/Minutes on 2021/2/5

Zoom Meeting

CRY+VIS Interface Meeting

13:30-14:00

Participants:

Post O3 Upgrade portal

Copy from previous meeting

  • Schedule for IX: Connection is scheduled in the week of 2/8.
  • Schedule for IY: Disconnection was scheduled on 3/11.
  • Schedule for EX: Connection was scheduled in the week of 3/15.
  • Corrugate tube fixing jig: Re-measurement is planed in 2/26-3/1 at IYV.
  • Commissioning in vacuum: Two phased commissioning will be tried in IX at beginning. After that, one phase is default.
  • Acceptance check: Cryo-payload in IX and Type-A tower in EY are on going.
  • Jig for FC painting: Under manufacturing.
  • PF actuator: by the end of January.

VIS Meeting

14:00-16:00

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

Next meeting

KAGRA/Subgroups/VIS/VISMinutes20210205 (last edited 2021-02-11 21:23:44 by RyutaroTakahashi)