Differences between revisions 24 and 25
Revision 24 as of 2021-02-03 08:45:02
Size: 5993
Editor: KousekiMiyo
Comment:
Revision 25 as of 2021-02-03 09:27:19
Size: 6340
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
 * Friday, '''takafumi.ushiba''', VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15864|15864]]
 *
Friday, '''ryutaro.takahashi''', VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15866|15866]]
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15864|15864]], Friday, '''takafumi.ushiba''', VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860)
 *
[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15866|15866]], Friday, '''ryutaro.takahashi''', VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860)
Line 7: Line 7:
 * Sunday, '''kouseki.miyo''', VIS/General, Some suspensions are not SAFE., [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15868|15868]]
 *
Sunday, '''fabian.arellano''', VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15869|15869]]
 *
Sunday, '''kouseki.miyo''', VIS/General, ISOLATED state is available with only LVDTs not blended sensors., [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15871|15871]]
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15868|15868]], Sunday, '''kouseki.miyo''', VIS/General, Some suspensions are not SAFE.
 *
[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15869|15869]], Sunday, '''fabian.arellano''', VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844)
 *
[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15871|15871]], Sunday, '''kouseki.miyo''', VIS/General, ISOLATED state is available with only LVDTs not blended sensors.
Line 11: Line 11:
 * Monday, '''ryutaro.takahashi''', VIS/OMM, Comment to Modification of ACCs (Click here to view original report: 15617), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15872|15872]]
 *
Monday, '''kouseki.miyo''', VIS/General, Comment to Relay Switch of Stepper Motor Driver (Click here to view original report: 15847), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15873|15873]]
 *
Monday, '''fabian.arellano''', VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15875|15875]]
 *
Monday, '''satoru.ikeda''', VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15876|15876]]
 *
Monday, '''satoru.ikeda''', VIS/General, Comment to We investigated the network connection. (Click here to view original report: 15737), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15877|15877]]
 *
Monday, '''takafumi.ushiba''', CRY/Cryo-payload EX, EX payload upgrade, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15878|15878]]
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15872|15872]], Monday, '''ryutaro.takahashi''', VIS/OMM, Comment to Modification of ACCs (Click here to view original report: 15617)
 *
[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15873|15873]], Monday, '''kouseki.miyo''', VIS/General, Comment to Relay Switch of Stepper Motor Driver (Click here to view original report: 15847)
 *
[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15875|15875]], Monday, '''fabian.arellano''', VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844)
 *
[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15876|15876]], Monday, '''satoru.ikeda''', VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857)
 *
[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15877|15877]], Monday, '''satoru.ikeda''', VIS/General, Comment to We investigated the network connection. (Click here to view original report: 15737)
 *
[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15878|15878]], Monday, '''takafumi.ushiba''', CRY/Cryo-payload EX, EX payload upgrade
Line 18: Line 18:
 * Tuesday, '''satoru.ikeda''', VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15880|15880]]
 *
Tuesday, '''takaaki.yokozawa''', PEM/Center, IXC, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15881|15881]]
 *
Tuesday, '''satoru.ikeda''', VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15882|15882]]
 *
Tuesday, '''takayuki.tomaru''', CRY/Cryostat IY, IYC test (temperature & frosting), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15883|15883]]
 *
Tuesday, '''rishabh.bajpai''', CRY/Cryostat IY, Vibration Analysis, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15884|15884]]
 *
Tuesday, '''satoru.ikeda''', VIS/PR3, Driveable range of the PR3 GAS SF stepper motor, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15886|15886]]
 *
Tuesday, '''kouseki.miyo''', VIS/General, All payload models are in PAYLOAD_MASTER.mdl, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15888|15888]]
 *
Tuesday, '''fabian.arellano''', VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15885|15885]]
 *
Tuesday, '''fabian.arellano''', VIS/PR3, Traverser motor test and cabling., [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15889|15889]]
 *
Tuesday, '''satoru.ikeda''', VIS/PR3, Comment to Traverser motor test and cabling. (Click here to view original report: 15889), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15890|15890]]
 *
Tuesday, '''ryutaro.takahashi''', VIS/EY, Setup of F3, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15891|15891]]
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15880|15880]], Tuesday, '''satoru.ikeda''', VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857)
 *
[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15881|15881]], Tuesday, '''takaaki.yokozawa''', PEM/Center, IXC
 *
[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15882|15882]], Tuesday, '''satoru.ikeda''', VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857)
 *
[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15883|15883]], Tuesday, '''takayuki.tomaru''', CRY/Cryostat IY, IYC test (temperature & frosting)
 *
[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15884|15884]], Tuesday, '''rishabh.bajpai''', CRY/Cryostat IY, Vibration Analysis
 *
[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15886|15886]], Tuesday, '''satoru.ikeda''', VIS/PR3, Driveable range of the PR3 GAS SF stepper motor
 *
[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15888|15888]], Tuesday, '''kouseki.miyo''', VIS/General, All payload models are in PAYLOAD_MASTER.mdl
 *
[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15885|15885]], Tuesday, '''fabian.arellano''', VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844)
 *
[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15889|15889]], Tuesday, '''fabian.arellano''', VIS/PR3, Traverser motor test and cabling.
 *
[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15890|15890]], Tuesday, '''satoru.ikeda''', VIS/PR3, Comment to Traverser motor test and cabling. (Click here to view original report: 15889)
 *
[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15891|15891]], Tuesday, '''ryutaro.takahashi''', VIS/EY, Setup of F3
'''Wednesday'''
 *
[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15893|15893]], Wednesday, '''kouseki.miyo''', VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891)
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15894|15894]], Wednesday, '''kouseki.miyo''', VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891)

Activities in this week

Friday

  • 15864, Friday, takafumi.ushiba, VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860)

  • 15866, Friday, ryutaro.takahashi, VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860)

Sunday

  • 15868, Sunday, kouseki.miyo, VIS/General, Some suspensions are not SAFE.

  • 15869, Sunday, fabian.arellano, VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844)

  • 15871, Sunday, kouseki.miyo, VIS/General, ISOLATED state is available with only LVDTs not blended sensors.

Monday

  • 15872, Monday, ryutaro.takahashi, VIS/OMM, Comment to Modification of ACCs (Click here to view original report: 15617)

  • 15873, Monday, kouseki.miyo, VIS/General, Comment to Relay Switch of Stepper Motor Driver (Click here to view original report: 15847)

  • 15875, Monday, fabian.arellano, VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844)

  • 15876, Monday, satoru.ikeda, VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857)

  • 15877, Monday, satoru.ikeda, VIS/General, Comment to We investigated the network connection. (Click here to view original report: 15737)

  • 15878, Monday, takafumi.ushiba, CRY/Cryo-payload EX, EX payload upgrade

Tuesday

  • 15880, Tuesday, satoru.ikeda, VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857)

  • 15881, Tuesday, takaaki.yokozawa, PEM/Center, IXC

  • 15882, Tuesday, satoru.ikeda, VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857)

  • 15883, Tuesday, takayuki.tomaru, CRY/Cryostat IY, IYC test (temperature & frosting)

  • 15884, Tuesday, rishabh.bajpai, CRY/Cryostat IY, Vibration Analysis

  • 15886, Tuesday, satoru.ikeda, VIS/PR3, Driveable range of the PR3 GAS SF stepper motor

  • 15888, Tuesday, kouseki.miyo, VIS/General, All payload models are in PAYLOAD_MASTER.mdl

  • 15885, Tuesday, fabian.arellano, VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844)

  • 15889, Tuesday, fabian.arellano, VIS/PR3, Traverser motor test and cabling.

  • 15890, Tuesday, satoru.ikeda, VIS/PR3, Comment to Traverser motor test and cabling. (Click here to view original report: 15889)

  • 15891, Tuesday, ryutaro.takahashi, VIS/EY, Setup of F3

Wednesday

  • 15893, Wednesday, kouseki.miyo, VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891)

  • 15894, Wednesday, kouseki.miyo, VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891)

This text is generated by python script in "/kagra/Dropbox/Personal/miyo/Scripts/klog/main.py".

Agenda/Minutes on 2021/2/5

Zoom Meeting

CRY+VIS Interface Meeting

13:30-14:00

Participants:

Post O3 Upgrade portal

Copy from previous meeting

  • Schedule for IX: Connection is scheduled in the week of 2/8.
  • Schedule for IY: Disconnection was scheduled on 3/11.
  • Schedule for EX: Connection was scheduled in the week of 3/15.
  • Corrugate tube fixing jig: Re-measurement is planed in 2/26-3/1 at IYV.
  • Commissioning in vacuum: Two phased commissioning will be tried in IX at beginning. After that, one phase is default.
  • Acceptance check: Cryo-payload in IX and Type-A tower in EY are on going.
  • Jig for FC painting: Under manufacturing.
  • PF actuator: by the end of January.

VIS Meeting

14:00-16:00

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

Next meeting

KAGRA/Subgroups/VIS/VISMinutes20210205 (last edited 2021-02-11 21:23:44 by RyutaroTakahashi)