* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15864|15864]], Friday, '''takafumi.ushiba''', VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15866|15866]], Friday, '''ryutaro.takahashi''', VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860) |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15864|15864]], VIS/IX, '''takafumi.ushiba''', Comment to Cabling for cryo-payload (Click here to view original report: 15860) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15866|15866]], VIS/IX, '''ryutaro.takahashi''', Comment to Cabling for cryo-payload (Click here to view original report: 15860) |
Line 7: | Line 7: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15868|15868]], Sunday, '''kouseki.miyo''', VIS/General, Some suspensions are not SAFE. * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15869|15869]], Sunday, '''fabian.arellano''', VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15871|15871]], Sunday, '''kouseki.miyo''', VIS/General, ISOLATED state is available with only LVDTs not blended sensors. |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15868|15868]], VIS/General, '''kouseki.miyo''', Some suspensions are not SAFE. * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15869|15869]], VIS/PR3, '''fabian.arellano''', Comment to Gluing the mirror wire. (Click here to view original report: 15844) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15871|15871]], VIS/General, '''kouseki.miyo''', ISOLATED state is available with only LVDTs not blended sensors. |
Line 11: | Line 11: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15872|15872]], Monday, '''ryutaro.takahashi''', VIS/OMM, Comment to Modification of ACCs (Click here to view original report: 15617) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15873|15873]], Monday, '''kouseki.miyo''', VIS/General, Comment to Relay Switch of Stepper Motor Driver (Click here to view original report: 15847) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15875|15875]], Monday, '''fabian.arellano''', VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15876|15876]], Monday, '''satoru.ikeda''', VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15877|15877]], Monday, '''satoru.ikeda''', VIS/General, Comment to We investigated the network connection. (Click here to view original report: 15737) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15878|15878]], Monday, '''takafumi.ushiba''', CRY/Cryo-payload EX, EX payload upgrade |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15872|15872]], VIS/OMM, '''ryutaro.takahashi''', Comment to Modification of ACCs (Click here to view original report: 15617) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15873|15873]], VIS/General, '''kouseki.miyo''', Comment to Relay Switch of Stepper Motor Driver (Click here to view original report: 15847) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15875|15875]], VIS/PR3, '''fabian.arellano''', Comment to Gluing the mirror wire. (Click here to view original report: 15844) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15876|15876]], VIS/PR2, '''satoru.ikeda''', Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15877|15877]], VIS/General, '''satoru.ikeda''', Comment to We investigated the network connection. (Click here to view original report: 15737) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15878|15878]], CRY/Cryo-payload EX, '''takafumi.ushiba''', EX payload upgrade |
Line 18: | Line 18: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15880|15880]], Tuesday, '''satoru.ikeda''', VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15881|15881]], Tuesday, '''takaaki.yokozawa''', PEM/Center, IXC * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15882|15882]], Tuesday, '''satoru.ikeda''', VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15883|15883]], Tuesday, '''takayuki.tomaru''', CRY/Cryostat IY, IYC test (temperature & frosting) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15884|15884]], Tuesday, '''rishabh.bajpai''', CRY/Cryostat IY, Vibration Analysis * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15886|15886]], Tuesday, '''satoru.ikeda''', VIS/PR3, Driveable range of the PR3 GAS SF stepper motor * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15888|15888]], Tuesday, '''kouseki.miyo''', VIS/General, All payload models are in PAYLOAD_MASTER.mdl * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15885|15885]], Tuesday, '''fabian.arellano''', VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15889|15889]], Tuesday, '''fabian.arellano''', VIS/PR3, Traverser motor test and cabling. * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15890|15890]], Tuesday, '''satoru.ikeda''', VIS/PR3, Comment to Traverser motor test and cabling. (Click here to view original report: 15889) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15891|15891]], Tuesday, '''ryutaro.takahashi''', VIS/EY, Setup of F3 |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15880|15880]], VIS/PR2, '''satoru.ikeda''', Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15881|15881]], PEM/Center, '''takaaki.yokozawa''', IXC * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15882|15882]], VIS/PR2, '''satoru.ikeda''', Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15883|15883]], CRY/Cryostat IY, '''takayuki.tomaru''', IYC test (temperature & frosting) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15884|15884]], CRY/Cryostat IY, '''rishabh.bajpai''', Vibration Analysis * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15886|15886]], VIS/PR3, '''satoru.ikeda''', Driveable range of the PR3 GAS SF stepper motor * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15888|15888]], VIS/General, '''kouseki.miyo''', All payload models are in PAYLOAD_MASTER.mdl * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15885|15885]], VIS/PR3, '''fabian.arellano''', Comment to Gluing the mirror wire. (Click here to view original report: 15844) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15889|15889]], VIS/PR3, '''fabian.arellano''', Traverser motor test and cabling. * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15890|15890]], VIS/PR3, '''satoru.ikeda''', Comment to Traverser motor test and cabling. (Click here to view original report: 15889) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15891|15891]], VIS/EY, '''ryutaro.takahashi''', Setup of F3 |
Line 30: | Line 30: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15893|15893]], Wednesday, '''kouseki.miyo''', VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15894|15894]], Wednesday, '''kouseki.miyo''', VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15905|15905]], Wednesday, '''tatsuki.washimi''', PEM/General, Bird watching (Ondotori maintenance) 2021 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15906|15906]], Wednesday, '''kouseki.miyo''', VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15908|15908]], Wednesday, '''takafumi.ushiba''', CRY/Cryo-payload EX, Comment to EX payload upgrade (Click here to view original report: 15878) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15911|15911]], Wednesday, '''satoru.ikeda''', VIS/PR3, Comment to Traverser motor test and cabling. (Click here to view original report: 15889) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15910|15910]], Wednesday, '''kouseki.miyo''', VIS/EY, TF measurement for F3 GAS filter * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15912|15912]], Wednesday, '''kouseki.miyo''', VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15913|15913]], Wednesday, '''takayuki.tomaru''', CRY/Cryostat IY, IYC cooler no.3 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15918|15918]], Wednesday, '''ryutaro.takahashi''', VIS/EY, Comment to Setup of F3 (Click here to view original report: 15891) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15919|15919]], Wednesday, '''ryutaro.takahashi''', VIS/EY, Setup of BF * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15920|15920]], Wednesday, '''satoru.ikeda''', VIS/PR3, Comment to Traverser motor test and cabling. (Click here to view original report: 15889) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15921|15921]], Wednesday, '''fabian.arellano''', VIS/SR3, Oplev installation. |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15893|15893]], VIS/EY, '''kouseki.miyo''', Comment to Setup of F3 (Click here to view original report: 15891) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15894|15894]], VIS/EY, '''kouseki.miyo''', Comment to Setup of F3 (Click here to view original report: 15891) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15905|15905]], PEM/General, '''tatsuki.washimi''', Bird watching (Ondotori maintenance) 2021 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15906|15906]], VIS/EY, '''kouseki.miyo''', Comment to Setup of F3 (Click here to view original report: 15891) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15908|15908]], CRY/Cryo-payload EX, '''takafumi.ushiba''', Comment to EX payload upgrade (Click here to view original report: 15878) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15911|15911]], VIS/PR3, '''satoru.ikeda''', Comment to Traverser motor test and cabling. (Click here to view original report: 15889) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15910|15910]], VIS/EY, '''kouseki.miyo''', TF measurement for F3 GAS filter * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15912|15912]], VIS/EY, '''kouseki.miyo''', Comment to Setup of F3 (Click here to view original report: 15891) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15913|15913]], CRY/Cryostat IY, '''takayuki.tomaru''', IYC cooler no.3 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15918|15918]], VIS/EY, '''ryutaro.takahashi''', Comment to Setup of F3 (Click here to view original report: 15891) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15919|15919]], VIS/EY, '''ryutaro.takahashi''', Setup of BF * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15920|15920]], VIS/PR3, '''satoru.ikeda''', Comment to Traverser motor test and cabling. (Click here to view original report: 15889) * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15921|15921]], VIS/SR3, '''fabian.arellano''', Oplev installation. |
Contents
Activities in this week
Friday
15864, VIS/IX, takafumi.ushiba, Comment to Cabling for cryo-payload (Click here to view original report: 15860)
15866, VIS/IX, ryutaro.takahashi, Comment to Cabling for cryo-payload (Click here to view original report: 15860)
Sunday
15868, VIS/General, kouseki.miyo, Some suspensions are not SAFE.
15869, VIS/PR3, fabian.arellano, Comment to Gluing the mirror wire. (Click here to view original report: 15844)
15871, VIS/General, kouseki.miyo, ISOLATED state is available with only LVDTs not blended sensors.
Monday
15872, VIS/OMM, ryutaro.takahashi, Comment to Modification of ACCs (Click here to view original report: 15617)
15873, VIS/General, kouseki.miyo, Comment to Relay Switch of Stepper Motor Driver (Click here to view original report: 15847)
15875, VIS/PR3, fabian.arellano, Comment to Gluing the mirror wire. (Click here to view original report: 15844)
15876, VIS/PR2, satoru.ikeda, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857)
15877, VIS/General, satoru.ikeda, Comment to We investigated the network connection. (Click here to view original report: 15737)
15878, CRY/Cryo-payload EX, takafumi.ushiba, EX payload upgrade
Tuesday
15880, VIS/PR2, satoru.ikeda, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857)
15881, PEM/Center, takaaki.yokozawa, IXC
15882, VIS/PR2, satoru.ikeda, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857)
15883, CRY/Cryostat IY, takayuki.tomaru, IYC test (temperature & frosting)
15884, CRY/Cryostat IY, rishabh.bajpai, Vibration Analysis
15886, VIS/PR3, satoru.ikeda, Driveable range of the PR3 GAS SF stepper motor
15888, VIS/General, kouseki.miyo, All payload models are in PAYLOAD_MASTER.mdl
15885, VIS/PR3, fabian.arellano, Comment to Gluing the mirror wire. (Click here to view original report: 15844)
15889, VIS/PR3, fabian.arellano, Traverser motor test and cabling.
15890, VIS/PR3, satoru.ikeda, Comment to Traverser motor test and cabling. (Click here to view original report: 15889)
15891, VIS/EY, ryutaro.takahashi, Setup of F3
Wednesday
15893, VIS/EY, kouseki.miyo, Comment to Setup of F3 (Click here to view original report: 15891)
15894, VIS/EY, kouseki.miyo, Comment to Setup of F3 (Click here to view original report: 15891)
15905, PEM/General, tatsuki.washimi, Bird watching (Ondotori maintenance) 2021
15906, VIS/EY, kouseki.miyo, Comment to Setup of F3 (Click here to view original report: 15891)
15908, CRY/Cryo-payload EX, takafumi.ushiba, Comment to EX payload upgrade (Click here to view original report: 15878)
15911, VIS/PR3, satoru.ikeda, Comment to Traverser motor test and cabling. (Click here to view original report: 15889)
15910, VIS/EY, kouseki.miyo, TF measurement for F3 GAS filter
15912, VIS/EY, kouseki.miyo, Comment to Setup of F3 (Click here to view original report: 15891)
15913, CRY/Cryostat IY, takayuki.tomaru, IYC cooler no.3
15918, VIS/EY, ryutaro.takahashi, Comment to Setup of F3 (Click here to view original report: 15891)
15919, VIS/EY, ryutaro.takahashi, Setup of BF
15920, VIS/PR3, satoru.ikeda, Comment to Traverser motor test and cabling. (Click here to view original report: 15889)
15921, VIS/SR3, fabian.arellano, Oplev installation.
This text is generated by script in "/kagra/Dropbox/Personal/miyo/Scripts/klog/main.py".
Agenda/Minutes on 2021/2/5
CRY+VIS Interface Meeting
13:30-
Participants:
Copy from previous meeting
- Schedule for IX: Connection is scheduled in the week of 2/8.
- Schedule for IY: Disconnection is scheduled on 3/11.
- Schedule for EX: Connection is scheduled in the week of 3/15.
- Corrugate tube fixing jig: Re-measurement is planed in 2/26-3/1 at IYV.
- Commissioning in vacuum: Two phased commissioning will be tried in IX at beginning. After that, one phase is default.
- Acceptance check: Cryo-payload in IX and Type-A tower in EY are on going.
- Jig for FC painting: Under manufacturing.
- PF actuator: by the end of January.
VIS Meeting
14:00-
Participants:
Progress report
General
Type-A
Type-B
Type-Bp
Type-C
Controls
Electronics
Towards O4
- Type-B/Bp remedy work is on going.
- Installation of Type-A is on going in EY.
- Schedule.
- Procedure documents.
- Criteria in the acceptance test.
Safety
Discussion
Travel Plans
The week from 2/8
- Takahashi: 2/8-12
- Sato: 2/8-12
- Hirata: 2/8-12
- Yano: 2/8-12
The week from 2/15
- Takahashi: 2/15-19
- Sato: 2/15-19
- Hirata: 2/15-19
- Yano: 2/15-19
Next meeting
- On 2020/2/12(Fri)