Differences between revisions 7 and 21 (spanning 14 versions)
Revision 7 as of 2021-02-01 07:50:06
Size: 8474
Editor: KousekiMiyo
Comment:
Revision 21 as of 2021-02-03 07:16:30
Size: 5986
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
<<TableOfContents(3)>>
= Activities in this week =
'''Friday'''
 * Friday, '''takafumi.ushiba''', VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15864|15864]]
 * Friday, '''ryutaro.takahashi''', VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15866|15866]]
'''Sunday'''
 * Sunday, '''kouseki.miyo''', VIS/General, Some suspensions are not SAFE., [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15868|15868]]
 * Sunday, '''fabian.arellano''', VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15869|15869]]
 * Sunday, '''kouseki.miyo''', VIS/General, ISOLATED state is available with only LVDTs not blended sensors., [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15871|15871]]
'''Monday'''
 * Monday, '''ryutaro.takahashi''', VIS/OMM, Comment to Modification of ACCs (Click here to view original report: 15617), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15872|15872]]
 * Monday, '''kouseki.miyo''', VIS/General, Comment to Relay Switch of Stepper Motor Driver (Click here to view original report: 15847), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15873|15873]]
 * Monday, '''fabian.arellano''', VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15875|15875]]
 * Monday, '''satoru.ikeda''', VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15876|15876]]
 * Monday, '''satoru.ikeda''', VIS/General, Comment to We investigated the network connection. (Click here to view original report: 15737), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15877|15877]]
 * Monday, '''takafumi.ushiba''', CRY/Cryo-payload EX, EX payload upgrade, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15878|15878]]
'''Tuesday'''
 * Tuesday, '''satoru.ikeda''', VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15880|15880]]
 * Tuesday, '''takaaki.yokozawa''', PEM/Center, IXC, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15881|15881]]
 * Tuesday, '''satoru.ikeda''', VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15882|15882]]
 * Tuesday, '''takayuki.tomaru''', CRY/Cryostat IY, IYC test (temperature & frosting), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15883|15883]]
 * Tuesday, '''rishabh.bajpai''', CRY/Cryostat IY, Vibration Analysis, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15884|15884]]
 * Tuesday, '''satoru.ikeda''', VIS/PR3, Driveable range of the PR3 GAS SF stepper motor, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15886|15886]]
 * Tuesday, '''kouseki.miyo''', VIS/General, All payload models are in PAYLOAD_MASTER.mdl, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15888|15888]]
 * Tuesday, '''fabian.arellano''', VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15885|15885]]
 * Tuesday, '''fabian.arellano''', VIS/PR3, Traverser motor test and cabling., [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15889|15889]]
 * Tuesday, '''satoru.ikeda''', VIS/PR3, Comment to Traverser motor test and cabling. (Click here to view original report: 15889), [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15890|15890]]
 * Tuesday, '''ryutaro.takahashi''', VIS/EY, Setup of F3, [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15891|15891]]
This text is generated by script in "/kagra/Dropbox/Personal/miyo/Scripts/klog/main.py".
Line 3: Line 33:

== Activities in this week ==
=== 2021/01/29 - 2021/01/31 ===
1
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15871|15871]]: VIS/General, '''kouseki.miyo''', ISOLATED state is available with only LVDTs not blended sensors.
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15870|15870]]: CAL/General, '''dan.chen''', YPcal noise investigation
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15869|15869]]: VIS/PR3, '''fabian.arellano''', Comment to Gluing the mirror wire. (Click here to view original report: 15844)
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15868|15868]]: VIS/General, '''kouseki.miyo''', Some suspensions are not SAFE.
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15867|15867]]: DGS/General, '''takahiro.yamamoto''', Security update for the gateway server
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15866|15866]]: VIS/IX, '''ryutaro.takahashi''', Comment to Cabling for cryo-payload (Click here to view original report: 15860)
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15865|15865]]: DGS/General, '''takahiro.yamamoto''', Installation of a new script server (k1script1)
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15864|15864]]: VIS/IX, '''takafumi.ushiba''', Comment to Cabling for cryo-payload (Click here to view original report: 15860)
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15863|15863]]: CAL/General, '''dan.chen''', Safety measures in EYA area
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15862|15862]]: CAL/General, '''dan.chen''', New storage space for apparatus
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15860|15860]]: VIS/IX, '''ryutaro.takahashi''', Cabling for cryo-payload
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15859|15859]]: VIS/General, '''shinji.miyoki''', Comment to Temperature during O3GK. (Click here to view original report: 15816)
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15858|15858]]: VIS/PR2, '''kouseki.miyo''', Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857)
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15857|15857]]: VIS/PR2, '''satoru.ikeda''', The PR2-SF's stepper motor has stalled.
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15856|15856]]: VIS/PR3, '''fabian.arellano''', Comment to Gluing the mirror wire. (Click here to view original report: 15844)
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15855|15855]]: PEM/General, '''shoichi.oshino''', Replaced wether station PC
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15854|15854]]: VIS/General, '''satoru.ikeda''', Comment to Relay Switch of Stepper Motor Driver (Click here to view original report: 15847)
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15853|15853]]: VIS/SR3, '''fabian.arellano''', Looking for a place for a thermistor around the payload.
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15852|15852]]: VIS/PR3, '''fabian.arellano''', Comment to Gluing the mirror wire. (Click here to view original report: 15844)
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15849|15849]]: CRY/Cryo-payload IX, '''takafumi.ushiba''', Comment to Cabling between BF and PF (Click here to view original report: 15835)
2
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15848|15848]]: CAL/General, '''darkhan.tuyenbayev''', PcalY noise investigation on January 26
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15844|15844]]: VIS/PR3, '''fabian.arellano''', Gluing the mirror wire.
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15847|15847]]: VIS/General, '''satoru.ikeda''', Relay Switch of Stepper Motor Driver
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15846|15846]]: VIS/General, '''shinji.miyoki''', Comment to Temperature during O3GK. (Click here to view original report: 15816)
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15845|15845]]: VIS/General, '''satoru.ikeda''', Comment to We investigated the network connection. (Click here to view original report: 15737)
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15843|15843]]: VIS/General, '''shinji.miyoki''', Comment to Temperature during O3GK. (Click here to view original report: 15816)
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15842|15842]]: DGS/General, '''takahiro.yamamoto''', Hangup problem on k1tw0 is maybe fixed
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15841|15841]]: VIS/EY, '''kouseki.miyo''', Comment to Stepper motor circuit for ETMY_IP seems be broken (Click here to view original report: 15839)
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15840|15840]]: VIS/EY, '''kouseki.miyo''', Comment to Stepper motor circuit for ETMY_IP seems be broken (Click here to view original report: 15839)
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15839|15839]]: VIS/EY, '''kouseki.miyo''', Stepper motor circuit for ETMY_IP seems be broken
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15837|15837]]: CRY/Cryostat IY, '''nobuhiro.kimura''', Comment to Start cooling of the payload at IYC (Click here to view original report: 15768)
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15838|15838]]: VIS/General, '''takaaki.yokozawa''', Comment to Temperature during O3GK. (Click here to view original report: 15816)
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15836|15836]]: VIS/PR3, '''fabian.arellano''', Traverser motor connection check
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15835|15835]]: CRY/Cryo-payload IX, '''takafumi.ushiba''', Cabling between BF and PF
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15834|15834]]: DGS/General, '''takahiro.yamamoto''', BS workstation update
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15833|15833]]: CRY/General, '''takafumi.ushiba''', Storage of MN/PF OpLev viewports and laser source
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15832|15832]]: IOO/IMC, '''kenta.tanaka''', Comment to IMC alignment (Click here to view original report: 15830)
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15831|15831]]: VIS/General, '''satoru.ikeda''', Installing picomotor drivers for PR2_BF and PR3_BF
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15830|15830]]: IOO/IMC, '''masayuki.nakano''', IMC alignment
 * klog#[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=15829|15829]]: VAC/General, '''tatsuki.washimi''', Vacumm monitor

Activities in this week

Friday

  • Friday, takafumi.ushiba, VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860), 15864

  • Friday, ryutaro.takahashi, VIS/IX, Comment to Cabling for cryo-payload (Click here to view original report: 15860), 15866

Sunday

  • Sunday, kouseki.miyo, VIS/General, Some suspensions are not SAFE., 15868

  • Sunday, fabian.arellano, VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844), 15869

  • Sunday, kouseki.miyo, VIS/General, ISOLATED state is available with only LVDTs not blended sensors., 15871

Monday

  • Monday, ryutaro.takahashi, VIS/OMM, Comment to Modification of ACCs (Click here to view original report: 15617), 15872

  • Monday, kouseki.miyo, VIS/General, Comment to Relay Switch of Stepper Motor Driver (Click here to view original report: 15847), 15873

  • Monday, fabian.arellano, VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844), 15875

  • Monday, satoru.ikeda, VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857), 15876

  • Monday, satoru.ikeda, VIS/General, Comment to We investigated the network connection. (Click here to view original report: 15737), 15877

  • Monday, takafumi.ushiba, CRY/Cryo-payload EX, EX payload upgrade, 15878

Tuesday

  • Tuesday, satoru.ikeda, VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857), 15880

  • Tuesday, takaaki.yokozawa, PEM/Center, IXC, 15881

  • Tuesday, satoru.ikeda, VIS/PR2, Comment to The PR2-SF's stepper motor has stalled. (Click here to view original report: 15857), 15882

  • Tuesday, takayuki.tomaru, CRY/Cryostat IY, IYC test (temperature & frosting), 15883

  • Tuesday, rishabh.bajpai, CRY/Cryostat IY, Vibration Analysis, 15884

  • Tuesday, satoru.ikeda, VIS/PR3, Driveable range of the PR3 GAS SF stepper motor, 15886

  • Tuesday, kouseki.miyo, VIS/General, All payload models are in PAYLOAD_MASTER.mdl, 15888

  • Tuesday, fabian.arellano, VIS/PR3, Comment to Gluing the mirror wire. (Click here to view original report: 15844), 15885

  • Tuesday, fabian.arellano, VIS/PR3, Traverser motor test and cabling., 15889

  • Tuesday, satoru.ikeda, VIS/PR3, Comment to Traverser motor test and cabling. (Click here to view original report: 15889), 15890

  • Tuesday, ryutaro.takahashi, VIS/EY, Setup of F3, 15891

This text is generated by script in "/kagra/Dropbox/Personal/miyo/Scripts/klog/main.py".

Agenda/Minutes on 2021/2/5

Zoom Meeting

CRY+VIS Interface Meeting

13:30-14:00

Participants:

Post O3 Upgrade portal

Copy from previous meeting

  • Schedule for IX: Connection is scheduled in the week of 2/8.
  • Schedule for IY: Disconnection was scheduled on 3/11.
  • Schedule for EX: Connection was scheduled in the week of 3/15.
  • Corrugate tube fixing jig: Re-measurement is planed in 2/26-3/1 at IYV.
  • Commissioning in vacuum: Two phased commissioning will be tried in IX at beginning. After that, one phase is default.
  • Acceptance check: Cryo-payload in IX and Type-A tower in EY are on going.
  • Jig for FC painting: Under manufacturing.
  • PF actuator: by the end of January.

VIS Meeting

14:00-16:00

Participants:

Progress report

General

Type-A

Type-B

Type-Bp

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

Next meeting

KAGRA/Subgroups/VIS/VISMinutes20210205 (last edited 2021-02-11 21:23:44 by RyutaroTakahashi)