13:30-14:00
 * Date : 13:30-
 * Participants :

[[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Upgrades/PostO3Upgrades|Post O3 Upgrade portal]]

== Schedule ==
 * IX: Setting Oplev by 3/10. Preparing additional spring for BF.
 * IY: Disconnection is scheduled on 3/11.
 * EX: Connection is scheduled in the week of 3/15.

== Status ==
 * Corrugate tube fixing jig: Re-measurement is on going in 2/25-3/2 at IYV.
 * Commissioning in air: Commissioning of IX will be deley.
 * Commissioning in vacuum:
 * Acceptance check: Cryo-payload in IX/EX and Type-A tower in EY/IX are on going.
 * PF actuator: Not evaluated in IX, but after the commissioning for suspension.
 * Jig for FC painting: Assembling.
 * Overall commissioning: To be considered about personnel.

-----------

= VIS Meeting =
14:00-
Line 9: Line 35:
[[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Upgrades/PostO3Upgrades|Post O3 Upgrade portal]]


= VIS Meeting =
14:00-16:00

Participants:
== Schedule ==
Line 18: Line 38:
<<MonthCalendar(,2021,2)>>
Line 19: Line 40:
=== General ===

=== Type-A ===
=== Type-B ===
=== Type-Bp ===

=== Type-C ===
=== Controls ===

=== Electronics ===

== Towards O4 ==
Line 36: Line 45:
The week from 3/1

Takahashi: 3/1-5
Sato: 3/1-5
Hirata: 3/1-5
Yano: 3/1-5

The week from 3/8

Takahashi: 3/8-3/12
Sato: 3/8-3/12
Hirata: 3/8-3/12
Yano: 3/8-3/12
Line 37: Line 60:
 * 2021/3/5(FRI)

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

  • Date : 13:30-
  • Participants :

Post O3 Upgrade portal

Schedule

  • IX: Setting Oplev by 3/10. Preparing additional spring for BF.
  • IY: Disconnection is scheduled on 3/11.
  • EX: Connection is scheduled in the week of 3/15.

Status

  • Corrugate tube fixing jig: Re-measurement is on going in 2/25-3/2 at IYV.
  • Commissioning in air: Commissioning of IX will be deley.
  • Commissioning in vacuum:
  • Acceptance check: Cryo-payload in IX/EX and Type-A tower in EY/IX are on going.
  • PF actuator: Not evaluated in IX, but after the commissioning for suspension.
  • Jig for FC painting: Assembling.
  • Overall commissioning: To be considered about personnel.


VIS Meeting

14:00-

Participants:

Schedule

Progress report

<< <  2021 / 2 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28

Safety

Discussion

Travel Plans

The week from 3/1

Takahashi: 3/1-5 Sato: 3/1-5 Hirata: 3/1-5 Yano: 3/1-5

The week from 3/8

Takahashi: 3/8-3/12 Sato: 3/8-3/12 Hirata: 3/8-3/12 Yano: 3/8-3/12

Next meeting

  • 2021/3/5(FRI)