The week from 3/1

Takahashi: 3/1-5
Sato: 3/1-5
Hirata: 3/1-5
Yano: 3/1-5

The week from 3/8

Takahashi: 3/8-3/12
Sato: 3/8-3/12
Hirata: 3/8-3/12
Yano: 3/8-3/12
Line 46: Line 60:
 * 2021/3/5(FRI)

Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

  • Date : 13:30-
  • Participants :

Post O3 Upgrade portal

Schedule

  • IX: Setting Oplev by 3/10. Preparing additional spring for BF.
  • IY: Disconnection is scheduled on 3/11.
  • EX: Connection is scheduled in the week of 3/15.

Status

  • Corrugate tube fixing jig: Re-measurement is on going in 2/25-3/2 at IYV.
  • Commissioning in air: Commissioning of IX will be deley.
  • Commissioning in vacuum:
  • Acceptance check: Cryo-payload in IX/EX and Type-A tower in EY/IX are on going.
  • PF actuator: Not evaluated in IX, but after the commissioning for suspension.
  • Jig for FC painting: Assembling.
  • Overall commissioning: To be considered about personnel.


VIS Meeting

14:00-

Participants:

Schedule

Progress report

<< <  2021 / 2 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28

Safety

Discussion

Travel Plans

The week from 3/1

Takahashi: 3/1-5 Sato: 3/1-5 Hirata: 3/1-5 Yano: 3/1-5

The week from 3/8

Takahashi: 3/8-3/12 Sato: 3/8-3/12 Hirata: 3/8-3/12 Yano: 3/8-3/12

Next meeting

  • 2021/3/5(FRI)

KAGRA/Subgroups/VIS/VISMinutes20210226 (last edited 2021-02-26 15:00:01 by RyutaroTakahashi)